摘    要:为判断3/2接线保护TA二次接线是否正确,以赵家山变电站3/2接线方式为例,分析了带负荷测相量的重要性,介绍了测量方法及其现场测试的注意事项。通过实例及数据分析,证明该方法能准确无误地判断接线。

关 键 词:3/2接线  TA二次接线  相量测试

Phase Test with Load of Breaker and a Half Configuration Relay
LIU Jian-jie,ZHANG Bo,ZHAI Xiao-jia.Phase Test with Load of Breaker and a Half Configuration Relay[J].Sci-Tech Information Development & Economy,2010,20(11):166-168.
Authors:LIU Jian-jie  ZHANG Bo  ZHAI Xiao-jia
Institution:LIU Jian-jie,ZHANG Bo,ZHAI Xiao-jia
Abstract:In order to judge whether relay secondary TA wiring of breaker and a half configuration is correct,this paper analyzes the importance of phase test with load based on breaker and a half configuration in Zhaojiashan Substation,and introduces the methods and some notes of the field test,and through examples and data analysis,proves that this method can be used to accurately judge the connection.
Keywords:breaker and a half configuration  relay secondary TA wiring  phase test