首页 | 本学科首页   官方微博 | 高级检索  
     检索      

安全高效通过68302工作面大断层探讨
引用本文:刘安保.安全高效通过68302工作面大断层探讨[J].科技情报开发与经济,2010,20(24):222-224.
作者姓名:刘安保
作者单位:山西焦煤西山煤电杜儿坪矿,山西太原,030024
摘    要:杜儿坪矿北三68302工作面在回采过程中,遇到一条落差H为3.0m~3.1m、横贯工作面正副巷的大断层。该矿采取了沿断层面掘送探巷提前支护断层破碎带顶板、工作面预挑顶、煤壁注浆等手段,安全高效地回采,通过了该大断层。

关 键 词:过断层技术  方案选择  煤炭开采

Passing through the Giant Fault on 68302 Working Face Safely and Efficiently with Various Measures
LIU An-bao.Passing through the Giant Fault on 68302 Working Face Safely and Efficiently with Various Measures[J].Sci-Tech Information Development & Economy,2010,20(24):222-224.
Authors:LIU An-bao
Abstract:In the course of stoping,there is a giant fault with fault throw of 3.0 m~3.1 m traversing 68302 working face of Du'erping Coal mine.And Du'erping Coal mine adopt various measures such as pre-supporting the fault broken roof along fault surface,pre-roof-brushing on working face,and grouting on coal wall,etc.,passing through the giant fault safely and efficiently.
Keywords:technique for passing through fault  scheme selection  coal mining
本文献已被 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号