首页 | 本学科首页   官方微博 | 高级检索  
     检索      

建设项目国民经济评价中资源投入物的价格问题*
引用本文:顾圣平.建设项目国民经济评价中资源投入物的价格问题*[J].河海大学学报(自然科学版),2000,28(2):106-108.
作者姓名:顾圣平
作者单位:河海大学水利水电工程学院,江苏,南京,210098
摘    要:阐述了影子价格的意义及其应用方法;按可持续发展的观点,分析资源价值的内涵,提出资源投入物可持续发展外部成本的概念,探讨建设项目国民经济评价采用的资源投入物计算价格,表明该计算价格中与可持续发展外部成本相应的价格组成部分可通过补偿价格确定。

关 键 词:建设项目  国民经济评价  资源投入物  价格
修稿时间:1999-07-20

Calculated Price of Resources Goods for Project Economic Analysis
GU Sheng,ping.Calculated Price of Resources Goods for Project Economic Analysis[J].Journal of Hohai University (Natural Sciences ),2000,28(2):106-108.
Authors:GU Sheng  ping
Abstract:In this paper, the meaning of the shadow price and its application are illustrated. The nature of the value of resources is studied from the viewpoint of sustainable development. The concept of sustainable development external cost of the goods of resources is introduced. The calculated price of the goods of resources for project economic analysis is dealt with from resources compensation viewpoint,and the compensation-price can be used for determining the component of the calculated price corresponding to sustainable development external cost of the goods of resources.
Keywords:construction project  economic  analysis  goods of resources  allocation of resources  shadow price  sustainable  development  external cost
本文献已被 CNKI 维普 万方数据 等数据库收录!
点击此处可从《河海大学学报(自然科学版)》浏览原始摘要信息
点击此处可从《河海大学学报(自然科学版)》下载免费的PDF全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号