首页 | 本学科首页   官方微博 | 高级检索  
     检索      


Research on the special lifting devices for steel box girders of Sutong Bridge
Authors:Chen Ming  Wu Qihe  Luo Chengbin  Zhou Hanfa
Institution:1.CCCC-Second Harbour Engineering Company Limited;Wuhan 430014;China;2.Key Lab of Large-span Bridge Construction Technology;Ministry of Communications;Wuhan 430071;China
Abstract:Sutong Bridge is a cable-stayed bridge with a steel box girder and a main span of 1 088 m.The steel box girder of main span includes five portions:back span large unit,large block of pylon,standard girder,back span closure girder and middle span closure girder.Each back span large unit is fabricated by welding several deck segments together in factory,and is erected by floating crane.As navigational clearance of the main bridge is high,the traditional truss lifting device can't satisfy the requirement of do...
Keywords:Sutong Bridge  large units  lifting devices  cantilever installation  lifting gantry  design and use  
本文献已被 CNKI 维普 万方数据 等数据库收录!
点击此处可从《工程科学》浏览原始摘要信息
点击此处可从《工程科学》下载免费的PDF全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号