Determination of the Financing Scale, Time Limit and Returns from the Investment in BOT Projects
Authors:Chen Shouke and Wei Zhuobin
Institution:Navy Engineering University, Tianjin 300450, China
Abstract:The key aspect to the successful implementation of BOT concept is the raising of finance by project sponsor, so financial engineering techniques and capital structuring skills are required to find the proper mix of debt and equity. The capital structure and present a model to determine the equity level from the aspects of financing scale, construction time and return on investment are analyzed. The resulting model can help the sponsor to avoid the capital risk, and offer the government a criterion to evaluate management ability of the sponsor. To show the application and availability of this model, a case study is conducted. Thus, this paper is concern with the determination of financing scale, construction time, and return on investment which would assist the sponsor to ensure that the equity level for optimal capital structure is available prior to the implementation stage in BOT project operation.
Keywords:capital risk  financing scale  time limit  returns of investment  BOT project
本文献已被 维普 万方数据 等数据库收录!
点击此处可从《工程科学》浏览原始摘要信息
点击此处可从《工程科学》下载免费的PDF全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号