首页 | 本学科首页   官方微博 | 高级检索  
     检索      

基于WBS-RBS与粗糙集理论的分离立交桥梁工程施工安全风险分析
引用本文:姚德隆,陶卫中,洪昌寿.基于WBS-RBS与粗糙集理论的分离立交桥梁工程施工安全风险分析[J].南华大学学报(自然科学版),2018,32(6):44-51.
作者姓名:姚德隆  陶卫中  洪昌寿
作者单位:南华大学 资源环境与安全工程学院,湖南 衡阳 421001,四川核工业地质局,四川 成都 610017,南华大学 资源环境与安全工程学院,湖南 衡阳 421001
摘    要:高速立交桥梁工程是高速公路建设的咽喉部位,其施工过程中存在许多安全隐患.对于风险管理而言,若能在施工前期分析出这些风险隐患,不仅能为施工过程提供安全保障,而且还能为施工安全管理提供依据.该研究采用作业分解结构-风险分解结构(work breakdown structure-risk breakdown structure,WBS-RBS)耦合矩阵分析法对高速立交桥施工作业风险和作业活动间的映射关系进行耦合分析,构建出风险分解矩阵(risk breakdown matrix,RBM),完整详细地对分离立交桥梁工程整个施工过程进行风险辨识,将各个风险因素对应于每项底层工作包.然后,运用粗糙集(rough set,RS)原理确定每项底层工作包中所含风险的权重.最后可根据权重值对施工过程中各作业单元的风险度进行排序,由此可掌握高速立交桥梁施工过程中的高危环节及各项作业单元风险度,以为施工过程中风险管理的重点提供科学依据.

关 键 词:分离立交桥梁施工风险  工作-风险分解结构(WBS-RBS)  风险矩阵(RBM)  粗糙集(RS)
收稿时间:2018/6/13 0:00:00

Construction Safety Risk Analysis of Separated Overpass Bridge Based on Work Breakdown Structure-risk Breakdown Structure and Rough Set Theory
YAO Delong,TAO Weizhong and HONG Changshou.Construction Safety Risk Analysis of Separated Overpass Bridge Based on Work Breakdown Structure-risk Breakdown Structure and Rough Set Theory[J].Journal of Nanhua University:Science and Technology,2018,32(6):44-51.
Authors:YAO Delong  TAO Weizhong and HONG Changshou
Institution:School of Resource & Environment and Safety Engineering,University of South China, Hengyang,Hunan 421001,China,Sichuan Province Nuclear Industry Geological Bureau, Chengdu,Sichuan 610017,China and School of Resource & Environment and Safety Engineering,University of South China, Hengyang,Hunan 421001,China
Abstract:The high-speed overpass and bridge project is the throat part of the highway construction.There are many hidden dangers in the construction process.For risk management,if these potential risks can be analyzed in the early stage of construction,it will not only provide security for the construction process,but also provide a basis for construction safety management.In this study,the work breakdown structure-risk breakdown structure (WBS-RBS) coupled matrix analysis method is used to analyze the mapping relationship between construction risk and work activity of high-speed overpass,and construct a risk breakdown matrix (RBM).Complete and detailed risk identification is carried out for the entire construction process of the separated overpass bridge project,so that each risk factor corresponds to each underlying work package.Then,the rough set (RS) principle is used to determine the weight of the risk contained in each underlying work package.Finally,according to the weight value,the risk degree of each operation unit in the construction process can be sorted,so that the high-risk link and various operation unit risk degrees in the construction process of the high-speed interchange bridge can be mastered to provide the scientific basis for the focus of risk management in the construction process.
Keywords:separation overpass bridge construction risk  work-risk breakdown structure  risk breakdown matrix  rough set
点击此处可从《南华大学学报(自然科学版)》浏览原始摘要信息
点击此处可从《南华大学学报(自然科学版)》下载免费的PDF全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号