首页 | 本学科首页   官方微博 | 高级检索  
     检索      

城市快速路建设时机的决策模型与准则
引用本文:袁胜强,曾小清,张伟略,盖松雪.城市快速路建设时机的决策模型与准则[J].同济大学学报(自然科学版),2019,47(9):1294-1301.
作者姓名:袁胜强  曾小清  张伟略  盖松雪
作者单位:上海市政工程设计研究总院(集团)有限公司, 上海 200092,同济大学 交通运输工程学院, 上海 201804,上海市政工程设计研究总院(集团)有限公司, 上海 200092,同济大学 交通运输工程学院, 上海 201804
基金项目:上海市科学技术委员会科研计划项目(17DZ1204000)
摘    要:提出了城市快速路建设时机包括首条快速路建设启动时机和快速路网建设时序安排两方面,指出城市快速路建设时机存在缺少科学决策依据的问题.在总结国内典型城市快速路建设时机安排经验的基础上,分析了城市首条快速路建设启动时机的影响因素,提出了基于经济总量、人口规模、城市面积、机动车保有量等指标的启动时机因素模型和相应决策准则;分析了快速路网建设时序安排的影响因素,将各影响因素标度量化后,建立了基于土地开发(更新)、功能影响、交通需求、工程实施条件、建设资金等指标的快速路网建设时序迫切度模型,并提出相应决策准则.最后,以嘉兴市为例说明模型和相应决策准则的应用.

关 键 词:快速路建设  启动时机  因素模型  建设时序  迫切度模型
收稿时间:2018/10/11 0:00:00
修稿时间:2019/7/1 0:00:00

Decision Model and Criteria of Urban Expressway Construction Timing
YUAN Shengqiang,ZENG Xiaoqing,ZHANG Weilue and GAI Songxue.Decision Model and Criteria of Urban Expressway Construction Timing[J].Journal of Tongji University(Natural Science),2019,47(9):1294-1301.
Authors:YUAN Shengqiang  ZENG Xiaoqing  ZHANG Weilue and GAI Songxue
Institution:Shanghai Municipal Engineering Design Institute(Group) Co., Ltd., Shanghai 200092, China,School of Transportation Engineering, Tongji University, Shanghai 201804, China,Shanghai Municipal Engineering Design Institute(Group) Co., Ltd., Shanghai 200092, China and School of Transportation Engineering, Tongji University, Shanghai 201804, China
Abstract:Two elements of urban expressway construction timing, which were the timing of startup of expressway and the construction sequence of expressway network were put forward. The dilemma that current urban expressway construction was lack of scientific decision-making basis was pointed out. The experience of urban expressway construction arrangement in typical domestic cities were summarized. Then, the factors affecting the timing of expressway construction startup were analyzed, and a factor model which based on gross domestic product, population scale, urban area, vehicle ownership et al was proposed with corresponding decision criteria. Then, the influencing factors of the construction sequence of the expressway network were also analyzed. Following the quantitation of influencing factors, an urgency model which based on land development (renewal) index, expressway functional impact index, traffic demand index, implementation condition index and construction capital index was proposed with corresponding decision criteria. In the end of the paper, Jiaxing expressway network was taken as an example to explain the models and corresponding decision criteria.
Keywords:urban expressway construction  startup timing  factors model  construction sequence  urgency model
本文献已被 CNKI 等数据库收录!
点击此处可从《同济大学学报(自然科学版)》浏览原始摘要信息
点击此处可从《同济大学学报(自然科学版)》下载免费的PDF全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号