桩底盾构施工引起的桩基承载力损失计算
引用本文:宫全美,张润来,余杰,周顺华.桩底盾构施工引起的桩基承载力损失计算[J].同济大学学报(自然科学版),2018,46(10):1384-1391.
作者姓名:宫全美  张润来  余杰  周顺华
作者单位:同济大学道路与交通工程教育部重点实验室
摘    要:提出一种桩底盾构施工引起的桩基承载能力损失计算方法.先实现考虑卸载过程的双曲线荷载传递函数编译,然后利用该桩土接触模型得到隧道开挖前和开挖后的Q~s曲线;取s=50mm时对应的荷载为桩基极限承载能力,采用桩基极限承载力损失百分比作为隧道开挖对桩基承载性能影响的评价指标.结合杭州地铁1号线某工点实例,分析了桩基承载曲线变化特征、桩体内力变化规律和承载力损失影响因素.案例中,盾构施工体积损失率控制在0.5%时,桩基承载力损失值为22%.隧道开挖后,桩体中存在一点侧摩阻力不变,在该点上部桩体侧摩阻力增大,在该点下部桩体侧摩阻力有所减小.承载力损失值随着体积损失率的增大而增大;桩基的初始荷载水平越大,承载力损失值越大;桩底与隧道顶部的距离越大,桩基承载力损失值越小.

关 键 词:桩基  盾构隧道  承载力
收稿时间:2017/9/29 0:00:00
修稿时间:2018/8/24 0:00:00

Calculating Method of Pile Bearing Capacity Loss Induced by the Tunnel Excavation Underneath the Pile
GONG Quanmei,ZHANG Runlai,YU Jie and ZHOU Shunhua.Calculating Method of Pile Bearing Capacity Loss Induced by the Tunnel Excavation Underneath the Pile[J].Journal of Tongji University(Natural Science),2018,46(10):1384-1391.
Authors:GONG Quanmei  ZHANG Runlai  YU Jie and ZHOU Shunhua
Institution:Key Laboratory of Road and Traffic Engineering of the Ministry of Education, Tongii University, Shanghai 201804, China,Key Laboratory of Road and Traffic Engineering of the Ministry of Education, Tongii University, Shanghai 201804, China,Key Laboratory of Road and Traffic Engineering of the Ministry of Education, Tongii University, Shanghai 201804, China and Key Laboratory of Road and Traffic Engineering of the Ministry of Education, Tongii University, Shanghai 201804, China
Abstract:A method was proposed to calculate the pile bearing capacity loss induced by the tunnel excavation underneath the pile. The hyperbolic load transfer function considering the effect of tunnel excavation at the pile soil interface was compiled and based on it, the Q~s curves of the pile and that after tunnel excavation were figured out. Ultimate bearing capacity of pile was confirmed where pile settlement was fifty millimeter, and it was used as the indicator to measure the influence caused by the excavation. The variation of bearing curve and pile forces as well as influencing factors to the bearing capacity were analyzed based on one work point of Hangzhou Metro Line 1. The bearing capacity loss of pile is 22% when volume loss rate is controlled at 0.5%. After tunnel excavation, there is a position in the pile where the lateral friction is unchanged, while the lateral friction increases upper the position and decreases bellow the position. The bearing capacity loss has a positive correlation with volume loss rate and Initial load of pile, however, has a negative correlation with the distance between the bottom of the pile and the top of the tunnel.
Keywords:pile foundation  shield tunnel  bearing capacity
本文献已被 CNKI 等数据库收录!
点击此处可从《同济大学学报(自然科学版)》浏览原始摘要信息
点击此处可从《同济大学学报(自然科学版)》下载免费的PDF全文