首页 | 本学科首页   官方微博 | 高级检索  
     检索      

钢筋套筒灌浆搭接连接的预制框架柱抗震试验
引用本文:余琼,匡轩,方永青.钢筋套筒灌浆搭接连接的预制框架柱抗震试验[J].同济大学学报(自然科学版),2019,47(1):0018-0028.
作者姓名:余琼  匡轩  方永青
作者单位:同济大学 结构工程与防灾研究所,上海 200092,同济大学 结构工程与防灾研究所,上海 200092,同济大学 结构工程与防灾研究所,上海 200092
摘    要:为研究竖向钢筋采用新型套筒灌浆搭接连接的预制柱的抗震性能,在已研发的Ⅰ、Ⅲ型套筒灌浆搭接接头的基础上进行了1个现浇柱、2个预制柱的拟静力试验.试验现象如下:现浇柱的初始水平裂缝出现在根部,预制柱由于套筒约束了混凝土的竖向应变,初始水平裂缝出现在套筒顶面;极限状态下现浇柱压碎区段长,预制柱压碎区段短.试验结果表明:预制柱的开裂、屈服荷载略大于现浇柱,极限荷载高于现浇柱;预制柱的开裂、屈服位移与现浇柱相近,极限荷载时位移、极限位移、延性系数大于现浇柱.由于预制柱根部套筒范围内箍筋加密,预制柱的耗能能力略优于现浇柱.Ⅰ、Ⅲ型套筒上下方钢筋应变基本一致,表明Ⅰ、Ⅲ型套筒在预制柱中能够很好的传递钢筋应力.

关 键 词:预制框架柱  拟静力试验  搭接连接  变形与延性  耗能能力
收稿时间:2018/3/6 0:00:00
修稿时间:2018/11/22 0:00:00

Experimental Study on Seismic Behavior of Precast Frame Column with Vertical Reinforcement Spliced by Grouted Sleeve Lapping Connector
YU Qiong,KUANG Xuan and FANG Yongqing.Experimental Study on Seismic Behavior of Precast Frame Column with Vertical Reinforcement Spliced by Grouted Sleeve Lapping Connector[J].Journal of Tongji University(Natural Science),2019,47(1):0018-0028.
Authors:YU Qiong  KUANG Xuan and FANG Yongqing
Institution:Research Institute of Structural Engineering and Disaster Reduction, Tongji University, Shanghai 200092, China,Research Institute of Structural Engineering and Disaster Reduction, Tongji University, Shanghai 200092, China and Research Institute of Structural Engineering and Disaster Reduction, Tongji University, Shanghai 200092, China
Abstract:In order to study the aseismic performance of the precast column connected with the new type of slurry anchor connection, a cast-in-place columns and two prefabricated column specimens, in which longitudinal reinforcement were connected by type I and III grouted sleeve lapping connector respectively, were designed for quasi-static test on the basis of the type I and III sleeve joint connection. The test phenomena show that the initial horizontal cracks of the cast-in-place column appear at the root. Because the vertical strain of the concrete is restrained by the sleeve, the initial horizontal cracks of the precast column appear on the top of the sleeve. In the limit state, the crushed part of the cast-in-place columns is long and the crushed part of the precast columns is short. The test results show that the cracking load and yield load of the precast column are slightly larger than the cast-in-place column, and the ultimate load of the precast column is higher. The cracking load, yield load of the two different types are almost the same, but the displacement under the ultimate load, ultimate displacement and ductility coefficient of the precast column are larger. Due to the stirrup encryption in the range of the sleeve of the precast column, the energy dissipation of the precast column is slightly better than the cast-in-place column. The strain of steel bar on the upper and lower parts of type I and type III sleeve is basically the same, so both of them can perform well in transferring the stress.
Keywords:precast frame column  pseudo-static test  lap connection  deformation and ductility  energy dissipation capacity
本文献已被 CNKI 等数据库收录!
点击此处可从《同济大学学报(自然科学版)》浏览原始摘要信息
点击此处可从《同济大学学报(自然科学版)》下载免费的PDF全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号