首页 | 本学科首页   官方微博 | 高级检索  
     检索      

基于层次分析模糊综合评价法的
引用本文:孙博,肖汝诚.基于层次分析模糊综合评价法的[J].同济大学学报(自然科学版),2015,43(11):1619-1625.
作者姓名:孙博  肖汝诚
作者单位:同济大学 土木工程学院,上海 200092,同济大学 土木工程学院,上海 200092
基金项目:国家“九七三”重点基础研究发展计划(2013CB036300);江西省交通厅重大科研项目(2012C0002)
摘    要:基于火灾分析理论和火灾场景分析进行桥梁火灾风险识别,建立多层次桥梁火灾风险评估指标体系;将模糊数学引入层次分析方法,结合传统的定性分析方法和定量分析方法各自的优势,采用层次分析-模糊综合评价法(AHP-FCE)估计风险概率和风险损失.应用层次分析法(AHP)建立各指标权重,利用模糊综合评价法(FCE)进行多层次综合评判;根据风险概率和风险损失估计值及其等级标准,通过二维风险评价矩阵获得桥梁火灾风险水平并给出基本的风险控制准则.运用上述评估体系对某跨江大桥方案火灾安全风险进行了分析评估.

关 键 词:桥梁火灾安全  层次分析法  模糊综合评价法
收稿时间:2014/6/12 0:00:00
修稿时间:2015/1/23 0:00:00

Bridge Fire Risk Assessment System Based on Analytic Hierarchy Process Fuzzy Comprehensive Evaluation Method
SUN Bo and XIAO Rucheng.Bridge Fire Risk Assessment System Based on Analytic Hierarchy Process Fuzzy Comprehensive Evaluation Method[J].Journal of Tongji University(Natural Science),2015,43(11):1619-1625.
Authors:SUN Bo and XIAO Rucheng
Institution:College of Civil Engineering, Tongji University, Shanghai 200092, China and College of Civil Engineering, Tongji University, Shanghai 200092, China
Abstract:Little attention is usually paid to the fire safety problem of bridge structures in the plan and design stage. This paper established a complete bridge fire risk assessment system to realize the assessment and prediction of the potential bridge fire risk in the plan and design stage. First, a multilayer risk evaluation index system of bridge fire safety was proposed by risk identification process based on performance based and fire scenario analysis. Then by innovatively introducing fuzzy mathematics into the analytic hierarchy process, the AHP FCE method was presented for evaluating the risk probability and risk loss, integrating the advantages of traditional quantitative evaluation method and qualitative evaluation method. The weighting coefficients of the indexes were calculated using the analytic hierarchy process (AHP) while the fuzzy comprehensive evaluation (FCE) was used to realize the multilayer comprehensive evaluation. Finally, the risk level of bridge fire safety was obtained by using the 2 dimension evaluation model based on the computed values of risk probability and risk loss and the evaluation criteria; and the basic risk control principles were given. As an example of engineering application, the fire risk level of a partially cable stayed bridge was assessed by using the proposed fire risk assessment system.
Keywords:
本文献已被 万方数据 等数据库收录!
点击此处可从《同济大学学报(自然科学版)》浏览原始摘要信息
点击此处可从《同济大学学报(自然科学版)》下载免费的PDF全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号