首页 | 本学科首页   官方微博 | 高级检索  
     检索      

综合管廊电力仓动态运维的解空间分割算法#br#
引用本文:周 平,韩宇泽,储 强.综合管廊电力仓动态运维的解空间分割算法#br#[J].吉林大学学报(信息科学版),2008,38(2):179-184.
作者姓名:周 平  韩宇泽  储 强
作者单位:南京供电公司 电缆医检室,南京 210000
摘    要:为解决综合管廊电力仓温度控制调配管理问题,有效提高其温控调配效果,提出了一种新的综合管廊电 力仓运维作业优化算法。该算法基于解空间分割原始思想,设计解空间分割处理机制,并应用其对当前综合管 廊电力运维下,不同等级电压进行测评,计算得到管廊电力仓磁场。基于电磁场数据,对自然对流微分方程、 能量方程联立求解,计算得到管廊电力运维作业的传导数据,获取电力仓温度的对接分布情况。最后对得到的 电力仓磁场计算数据和对流分析数据参数分别划分子空间,明确划分个数和空间个体数,获取最优解,实现运 维升级。实验数据证明,局部最高温度降低了将近 27%,绝对温度降低了 32%,电力仓温控调配效果显著。

关 键 词:   管廊电力仓    运维作业    能量方程  
收稿时间:2019-09-12

Dynamic Optimization Algorithm for Operation and Maintenance of Power Warehouse Based on Solution of Space Segmentation#br#
ZHOU Ping,HAN Yuze,CHU Qiang.Dynamic Optimization Algorithm for Operation and Maintenance of Power Warehouse Based on Solution of Space Segmentation#br#[J].Journal of Jilin University:Information Sci Ed,2008,38(2):179-184.
Authors:ZHOU Ping  HAN Yuze  CHU Qiang
Institution:Cable Inspection Room,Nanjing Power Supply Company,Nanjing 210000,China
Abstract:In order to improve the efficiency of temperature control and deployment,a new optimization algorithm for the operation and maintenance of integrated power warehouse is proposed. Based on the solution of space dividing original idea,design solution space segmentation processing mechanism,application solution space segmentation processing mechanism,the current comprehensive utility tunnel power operations,the different voltage grade evaluation,the current utility tunnel power storehouse magnetic field,electromagnetic field data capture are calculated,the natural convection into simultaneous solving differential equation,energy equation is solved simultaneously to calculate the conduction data of the current power operation and maintenance of the pipe gallery. Finally rely on the solution space division,the above to calculate the magnetic field calculation of power storehouse data and the analysis of convective parameters,delimit the molecular space respectively,clear number and individual number space,the optimal solution is obtained and the operation and maintenance upgrade is realized. Experimental data show that the local maximum temperature has been reduced by nearly 27%,and the absolute temperature has been reduced by 32%.
Keywords:pipe gallery power warehouse  operation and maintenance operations  energy equation  
点击此处可从《吉林大学学报(信息科学版)》浏览原始摘要信息
点击此处可从《吉林大学学报(信息科学版)》下载免费的PDF全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号