首页 | 本学科首页   官方微博 | 高级检索  
     检索      


A Job Scheduling Model and Heuristic Algorithm for Minimizing the Range of Lateness and Makespan on Parallel Machines
Abstract:In this paper ,based on JIT management technique, a multi objective job scheduling model is presented. After a new algorithm is presented for minimizing the range of lateness on a single machine , a heuristic algorithm (named M-R algorithm)is given to be applied to the parallel machines' systems . Finally , an illustrative example is given.
Keywords:job scheduling  production management  FMS  parallel machines
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号