首页 | 本学科首页   官方微博 | 高级检索  
     检索      

科技项目模糊综合评价方法研究
引用本文:李茹,张丽芳,褚诚缘.科技项目模糊综合评价方法研究[J].系统工程理论与实践,2006,26(9):66-76.
作者姓名:李茹  张丽芳  褚诚缘
作者单位:1. 山西大学计算机与信息技术学院,太原,030006
2. 中国科学院计算技术研究所,北京,100080
基金项目:国家高技术研究发展计划(863计划)
摘    要:在分析传统评价方法的基础上,综合主观评价与客观评价,提出一种主客观评价相结合、模糊技术与决策方法相结合的组合赋权模糊综合评价方法,该方法以对评价指标值进行模糊化、归一化和无量纲化预处理为前提,在融合经典方法的基础上,对项目实际完成情况进行定量分析,同时结合专家组的定性评价进行综合评判,既可避免人为的主观片面性,又能对专家意见给予足够的重视,并能对评价过程中遇到的信息的不完备性和不确定性做出相应的处理.该方法应用于国家863科技项目信息管理与评价实验系统(CSHWES),评价结果不仅体现了项目的实际完成情况,而且考虑了单个项目的完成情况在同类项目中所处的水平,使评价结果更加客观、公正、合理.

关 键 词:综合评价  组合赋权法  科技项目  层次分析法
文章编号:1000-6788(2006)09-0066-11
修稿时间:2005年8月1日

The Research on the Fuzzy Comprehensive Evaluation of Scientific and Technical Projects
LI Ru,ZHANG Li-fang,CHU Cheng-yuan.The Research on the Fuzzy Comprehensive Evaluation of Scientific and Technical Projects[J].Systems Engineering —Theory & Practice,2006,26(9):66-76.
Authors:LI Ru  ZHANG Li-fang  CHU Cheng-yuan
Abstract:By the analysis of traditional evaluation methods,this paper presents a combinatorial weighting fuzzy comprehensive evaluation method which is amalgamation of objective evaluation,subjective evaluation,fuzzy technology and making decision methods.With the fuzzification,normalization and non-dimension precondition of evaluation indices and on the basis of the inosculation of classical methods,the method makes quantitative analysis to the actual accomplishment of projects,and at the same time,it combines with the qualitative evaluation of the experts,and then give the final evaluation.In this way,the results can not only avoid the one sidedness of subjectivity but also attach importance to the experts' opinion.For the more,the incomplete and uncertainty information appeared in the evaluation process can be treated with by this method.The method has been applied to the Information Management and Evaluation System of "863" Technical Projects(CSHWES).The evaluating results not only show the actual performance of a technical project but also imply the level of the actual performance of a technical project within all the technical projects.It makes the evaluating results more equitable and reasonable.
Keywords:comprehensive evaluation  combinatorial weighting method  scientific and technical project  analytic hierarchy process  
本文献已被 CNKI 万方数据 等数据库收录!
点击此处可从《系统工程理论与实践》浏览原始摘要信息
点击此处可从《系统工程理论与实践》下载免费的PDF全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号