首页 | 本学科首页   官方微博 | 高级检索  
     检索      


Study on Project Progress Curve Model
Authors:Ding Shibao
Institution:Hunan University of Science & Technology , Xiangtan, Hunan 411201, China
Abstract:Because of the discrepancy of project types, the project progress curves present different characteristics. Studying project progress curves can reduce management risk of project and overall grasp the enforcement condition of the project. Combining project characteristic, this paper reaches 4 kinds of project progress curve patterns. If the front of the progress curve is concave, and its rear is protruding in the break point, it is named as S model. If its front is protruding and its rear is concave in the break point, it is named as the reverse side of S model. If the front and rear are concave in the break point, it is named as J model, and two half sections are both upward protruding, it is named as the reverse side of J model. Through a case study, it shows that application project progress curve model can better raise project management.
Keywords:progress curve model  reverse side of S model  reverse side of J model
本文献已被 维普 万方数据 等数据库收录!
点击此处可从《工程科学》浏览原始摘要信息
点击此处可从《工程科学》下载免费的PDF全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号