Study on Project Progress Curve Model |
| |
Authors: | Ding Shibao |
| |
Institution: | Hunan University of Science & Technology , Xiangtan, Hunan 411201, China |
| |
Abstract: | Because of the discrepancy of project types, the project progress curves present different characteristics. Studying project progress curves can reduce management risk of project and overall grasp the enforcement condition of the project. Combining project characteristic, this paper reaches 4 kinds of project progress curve patterns. If the front of the progress curve is concave, and its rear is protruding in the break point, it is named as S model. If its front is protruding and its rear is concave in the break point, it is named as the reverse side of S model. If the front and rear are concave in the break point, it is named as J model, and two half sections are both upward protruding, it is named as the reverse side of J model. Through a case study, it shows that application project progress curve model can better raise project management. |
| |
Keywords: | progress curve model reverse side of S model reverse side of J model |
本文献已被 维普 万方数据 等数据库收录! |
| 点击此处可从《工程科学》浏览原始摘要信息 |
| 点击此处可从《工程科学》下载免费的PDF全文 |
|