首页 | 本学科首页   官方微博 | 高级检索  
     检索      

基于ANSYS有限元分析法的FAST主索网结构参数化研究
引用本文:郑幸龄,熊健民,周金枝,舒展.基于ANSYS有限元分析法的FAST主索网结构参数化研究[J].科学技术与工程,2018,18(11).
作者姓名:郑幸龄  熊健民  周金枝  舒展
作者单位:湖北工业大学土木工程与环境资源学院,湖北工业大学土木工程与环境资源学院,湖北工业大学土木工程与环境资源学院,湖北工业大学土木工程与环境资源学院
摘    要:提出一种基于ANSYS有限元分析法的FAST主索网索网结构参数化设计方法,通过ANSYS有限元分析软件对FAST主索网结构进行参数化设计,利用参数化变量对有限元模型进行构建,为使用者提供有限元研究过程,将设定的函数、变量作为软件的输入,选用五轴对称短程线分型方法,主索网结构的网格分割方案包括四边形网格、凯威特网格以及短程线型网格。实验结果表明,短程线型方案最适合FAST主索网结构,侧偏量相对抛物面的可移动距离是无法忽略的,对主索网界面、风荷载与温度荷载进行计算,各项设计参数均符合FAST主索网结构设计要求。

关 键 词:ANSYS有限元分析法  环形对称  索网  结构  参数化
收稿时间:2017/9/23 0:00:00
修稿时间:2017/9/23 0:00:00

Parametric study of ring expanded symmetrical cable net structure based on ANSYS finite element method
Zheng Xingling,Xiong Jianmin,and Shu Zhan.Parametric study of ring expanded symmetrical cable net structure based on ANSYS finite element method[J].Science Technology and Engineering,2018,18(11).
Authors:Zheng Xingling  Xiong Jianmin  and Shu Zhan
Institution:School of civil engineering and environmental resources,Hubei University of Technology,School of civil engineering and environmental resources,Hubei University of Technology,,School of civil engineering and environmental resources,Hubei University of Technology
Abstract:A main cable network cable net structure parametric design method based on ANSYS finite element analysis method of FAST, using ANSYS finite element analysis software of FAST main cable net structure parametric design, use of parametric variables on the finite element model building process, the research of finite element for the user, will set the function, the selection of input variables as software, typing method for five axis symmetric short lines, the main cable mesh network structure segmentation scheme including quadrilateral mesh, mesh and geodesic grid kewitte. The experimental results show that the geodesic scheme is most suitable for FAST cable net structure, movable side offset paraboloid relative distance can not be neglected, the main cable network interface, wind load and temperature load are calculated, the design parameters are in conformity with the requirement of FAST network structure design of main cable.
Keywords:ANSYS finite element analysis  Ring symmetry  Cable net  structure  parameterization
点击此处可从《科学技术与工程》浏览原始摘要信息
点击此处可从《科学技术与工程》下载免费的PDF全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号