首页 | 本学科首页   官方微博 | 高级检索  
     检索      

市政道路下大断面平顶隧道浅埋暗挖施工应注意的问题
引用本文:董志友.市政道路下大断面平顶隧道浅埋暗挖施工应注意的问题[J].科技情报开发与经济,2005,15(16):286-288.
作者姓名:董志友
作者单位:深圳市东鹏工程建设监理有限公司,广东,深圳,518029
摘    要:结合工程实例,对大跨平顶直墙隧道浅埋暗挖施工中易出现的问题进行讨论,并针对相应的问题提出了处理措施。

关 键 词:大跨平顶直墙隧道  浅埋暗挖  隧道施工  路面沉降
文章编号:1005-6033(2005)16-0286-03
收稿时间:2005-06-03
修稿时间:2005年6月3日

The Shallowly-burying and Darkly-excavating Construction of the Tunnel with the Large-section and Flat-top under the Municipal Roads
DONG Zhi-you.The Shallowly-burying and Darkly-excavating Construction of the Tunnel with the Large-section and Flat-top under the Municipal Roads[J].Sci-Tech Information Development & Economy,2005,15(16):286-288.
Authors:DONG Zhi-you
Institution:DONG Zhi-you
Abstract:Connecting with the actual engineering examples, this paper discusses on the problems easily occurring in the shallowly-burying and darkly-excavating construction of the tunnel with the large-span, flat-top and straight wall, and puts forward some treating measures for the corresponding problems.
Keywords:tunnel with large-span  flat-top and straight wall  shallowly-burying and darkly-excavating construction  tunnel construction  settlement of road surface
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号