首页 | 本学科首页   官方微博 | 高级检索  
     检索      


Reliability of paste fill system of the Jinchuan No.2 mine
Institution:Civil and Environmental Engineering School, University of Science and Technology Beijing, Beijing 100083, China
Abstract:Because of poor ground conditions, stoping methods of underhand headings with cemented fill were used in the Jinchuan No.2 mine, apaste fill system was set up. In order to evaluate the reliability ofthe new system, investigations and trial running have been done. Morethan 20 items of modification or improvements related to paste preparation subsystem, pump and pipe subsystem, auto-controlling and monitoring subsystem were finished. The reliability of the paste fill system was analyzed by using the theory of large complex system, and it is useful in reliability study on paste fill system.
Keywords:paste fill system  reliability study  complex system theory
本文献已被 万方数据 等数据库收录!
点击此处可从《矿物冶金与材料学报》浏览原始摘要信息
点击此处可从《矿物冶金与材料学报》下载免费的PDF全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号