首页 | 本学科首页   官方微博 | 高级检索  
     检索      

高压喷射钻井水力参数优化研究
引用本文:张杰,宋国志,杨兰田,周伟.高压喷射钻井水力参数优化研究[J].科学技术与工程,2015,15(34).
作者姓名:张杰  宋国志  杨兰田  周伟
作者单位:“油气藏地质及开发工程”国家重点实验室?西南石油大学石油工程学院,“油气藏地质及开发工程”国家重点实验室?西南石油大学石油工程学院,中国石油化工股份有限公司西北油田分公司,中国石油化工股份有限公司西北油田分公司
摘    要:高压喷射钻井技术在国内外诸多油田都已进行了多次试验研究。进行水力参数优化研究可以指导现场作业,提高钻井速度、改善井眼的净化能力。通过对排量和喷嘴组合优选计算,分析了排量和喷嘴组合对立管压力、钻头压降、钻头水功率以及喷射速度的影响规律;并给出了一种高压喷射钻井技术水力参数优化方法。研究表明:当钻井泵排量增大后,各水力参数总体均呈上升趋势但增长速率不同;钻井液过流面积一定时,喷嘴组合的变化对立管压力影响较小;钻井液的过流面积发生微小变化时,钻头压力损耗的变化幅度最大,钻头水功率次之,对立管压力影响最小。最后针对塔河油田盐区某井中深部地层497~4 673 m井段,经优选水力参数后,以得到的推荐参数进行现场施工作业,平均机械钻速达到55.48 m/h,与邻井同井段(15.32 m/h)相比提高262%,该开次完井用时15.33 d,与设计相比节约30.79 d,节约率达到65.5%。

关 键 词:高压喷射  水力参数  钻井提速  塔河油田
收稿时间:2015/7/24 0:00:00
修稿时间:2015/8/26 0:00:00

Optimum on Hydraulic Parameters of the High Pressure Jet Drilling
zhangjie,songguozhi,and.Optimum on Hydraulic Parameters of the High Pressure Jet Drilling[J].Science Technology and Engineering,2015,15(34).
Authors:zhangjie  songguozhi  and
Abstract:High pressure jet drilling technology has been repeated experiments in many fields both at home and abroad. Engaging research on hydraulic parameters optimization can improve the drilling speed and improve the purification ability of borehole to guide field work preferably. Based on a optimization method for high pressure jet drilling hydraulic parameters, the drilling pump capacity and nozzle combination to the influence laws of pipe pressure, the pressure drop of the bit, drill water power and jet velocity were analyzed by related calculation. The results reveal that: drilling pump capacity increases, the hydraulic parameters are on the rise but overall growth rate is different; When drilling fluid flow area is constant, the impact of nozzle combination was little on pipe pressure; Drilling fluid flow area of changed slightly, the variation of bit pressure loss is the largest, drill water power followed, and the pipe pressure affected the minimum. Finally in view of a well in the mid-deep (497-4673m) salts area of the Tahe Oilfield, the optimizing hydraulic parameters were recommended. The tests indicate that the average ROP is 55.48 m/h, with same sections of adjacent wells (15.32 m/h) increased by 262%. The completion time takes 15.33 d, compared with the design to save 30.79d and the savings rate reached 65.5%.
Keywords:High pressure jet  Hydraulic parameters  Improve the drilling speed  Tahe Oilfield
本文献已被 CNKI 万方数据 等数据库收录!
点击此处可从《科学技术与工程》浏览原始摘要信息
点击此处可从《科学技术与工程》下载免费的PDF全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号