基于新意法理念的连拱隧道设计施工优化
引用本文:张国浩,褚存,郭嘉佳.基于新意法理念的连拱隧道设计施工优化[J].科学技术与工程,2021,21(32):13914-13918.
作者姓名:张国浩  褚存  郭嘉佳
作者单位:中交第二航务工程局有限公司
摘    要:通过采用三维地质建模技术建立乌龙山隧道的三维地质模型,基于新意法的核心理念通过FLAC3D程序对乌龙山隧道中导洞的全断面开挖过程进行了仿真分析,研究表明:在洞口超前管棚作用范围之内,全断面开挖时可无需对掌子面进行预加固;在管棚作用范围之外,通过对掌子面预加固后的不同工况模拟分析,得出玻璃纤维筋可以有效控制顶拱沉降以及减小掌子面挤出位移,用玻璃纤维筋加固掌子面后,顶拱沉降减少约40%,掌子面挤出变形减少约70%,极大的提高了掌子面的安全系数可实现每循环最大进尺三榀钢架(1.8m)的全断面快速开挖,并提出以不同搭接长度对应的掌子面挤出位移的曲线拐点来确定玻璃纤维筋的最小搭接长度。研究结果可为五级围岩的小断面隧道快速开挖提供借鉴。

关 键 词:隧道工程  小断面隧道  数值模拟  连拱隧道  新意法
收稿时间:2021/3/3 0:00:00
修稿时间:2021/9/6 0:00:00

Research on Design and Construction Optimization of Multi-arch Tunnel Based on ADECO-RS Approach
Zhang Guohao,Chu Cun,Guo Jiajia.Research on Design and Construction Optimization of Multi-arch Tunnel Based on ADECO-RS Approach[J].Science Technology and Engineering,2021,21(32):13914-13918.
Authors:Zhang Guohao  Chu Cun  Guo Jiajia
Institution:CCCC Second Harbour Engineering Co., Ltd.
Abstract:By using 3d geological modeling technology to establish the true 3D geological model of Wulongshan Tunnel, based on the core idea of the ADECO-RS, simulation calculation was carried out through FLAC3D program, the construction method of full section excavation in the tunnel was optimized. The results show that there is no need to pre-reinforce the tunnel face within the scope of action of the large pipe shed, outside the scope of the pipe shed, through the simulation and analysis of the different working conditions after the pre-reinforcement of the palm face, the results show that the glass fiber bars can effectively control the settlement of the top arch and reduce the extrusion displacement of the palm surface. After the glass fiber bars are used to strengthen the palm surface, the settlement of the top arch is reduced by about 40%, and the extrusion deformation of the palm surface is reduced by about 70%, the full section excavation of 1.8m per cycle can be realized after the palmtop is pre-strengthened outside the scope of the pipe shed. Based on the simulation of different working conditions, the curve inflection point of extrusion displacement of palm surface corresponding to different lap lengths is proposed to determine the minimum lap length of fiberglass bolt. The research results can provide reference for similar projects.
Keywords:Tunnel engineering  Small section tunnel  Numerical simulation  Multi-Arch tunnel  ADECO-RS approach