首页 | 本学科首页   官方微博 | 高级检索  
     检索      

5.0Mt/a常减压装置设备更新改造
引用本文:王旭.5.0Mt/a常减压装置设备更新改造[J].科技信息,2007(22):70-72.
作者姓名:王旭
作者单位:石家庄炼油化工股份有限公司一联合车间 河北石家庄050000
摘    要:简述了常减压装置进行的5.0Mt/a设备更新改造内容,并对装置改造后的标定结果进行分析,找出装置改造后存在的问题,并提出改进建议。

关 键 词:改造  常减压装置

Equipment Renovation of 5 Mt/a Crude Distillation Unit
Wang Xu.Equipment Renovation of 5 Mt/a Crude Distillation Unit[J].Science,2007(22):70-72.
Authors:Wang Xu
Abstract:The capacity of our crude distillation unit has been expanded to 5 million tons per annum this year from 3.5 Mt/a by replacing most equipment to larger sizes and adopting a number of advanced techniques.Through a schemed test run,the maximum throughput of the unit has reached the design capacity and a few shortcomings also have been discovered which are subject to refitting afterwards.
Keywords:renovation  CDU
本文献已被 CNKI 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号