花园基础大体积砼冬施作法
作者单位:山西省建工集团宝联公司 山西太原030002
摘    要:文章充分考虑到了施工所在地为山西最寒冷地区的低气温和2.2m厚近1000m2的筏板混凝土凝固过程的水化热等因素,使工程经过科学的计算和分析,应用综合蓄热法和暖棚法连续作业,依靠现场各个环节出色工作质量,保证了质量、保证了工期,取得了大体积混凝土浇筑的较好效果。

关 键 词:冬季施工  大体积混凝土浇筑

Construction Technique of Garden Foundation by Bulky Concrete in Winter
Authors:Fan Xing'an
Institution:Fan Xing'an
Abstract:In coldest area of Shanxi Province, solidifying process of 1000 m2 concrete plate of 2.2m thick, which contains factors such as heat of hydration etc, is calculated and analyzed scientificly and operated continuously by comprehensive heat accumulation method and warm shed method so that the quality and time limit of project are ensured depending on outstanding work of various links, achieving good result of bulky concrete pouring.
Keywords:construction in winter  bulky concrete pouring