首页 | 本学科首页   官方微博 | 高级检索  
     检索      

三跨连续梁桥边跨分步施工与同步施工初步比较
引用本文:王双领.三跨连续梁桥边跨分步施工与同步施工初步比较[J].科技情报开发与经济,2012,22(11):129-132.
作者姓名:王双领
作者单位:中铁三局集团第二工程有限公司,河北石家庄,050000
摘    要:以湘江特大桥小岔河桥的施工合龙方案为依据,从成桥部分受力状态、施工控制预拱度、施工工艺可行性等方面,粗略分析了分步施工与同步施工的不同,为同类桥梁的施工提供了参考。

关 键 词:桥梁施工  连续梁  同步施工  分步施工

Preliminary Comparison of Synchronous Construction and Step-by-step Construction of the Side Span of the Bridge with Three-span Continuous Beam
WANG Shuang-ling.Preliminary Comparison of Synchronous Construction and Step-by-step Construction of the Side Span of the Bridge with Three-span Continuous Beam[J].Sci-Tech Information Development & Economy,2012,22(11):129-132.
Authors:WANG Shuang-ling
Institution:WANG Shuang-ling
Abstract:Based on the construction closure scheme of Xiaochahe Bridge of Xianggjiang Grand Bridge, this paper analyzes the differences between synchronous construction and step-by-step construction from aspects of completed bridge part's stress state, construction controlled pre-camher, and construction technique's feasibility, etc., providing references for the construction of similar bridges.
Keywords:bridge continuous  continuous beam  synchronous construction  step-by-step construction
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号