首页 | 本学科首页   官方微博 | 高级检索  
     检索      

A Case-Based System for Construction Project Risk Management
引用本文:YANGLan-rong,ZHANGJin-long.A Case-Based System for Construction Project Risk Management[J].系统科学与系统工程学报(英文版),2002,11(4):419-424.
作者姓名:YANGLan-rong  ZHANGJin-long
作者单位:YANG Lan-rong,ZHANG Jin-long School of Public Administration,Huazhong University of Science and Technology,Wuhan 430074,China
基金项目:This project is supported by Foundation of Doctoral Programs in State Education Ministry(2 0 0 10 4 870 15)
摘    要:1 IntroductionIn the field of construction,project risk management is a complex and important task.Therefore,it is very important for construction project managers to consider all possiblerisk factors affecting a given construction project. Furthermore,they should examine howthese factors interact in the decision- making process and how to balance subjective beliefsand information in identifying risk and uncertainties,and information,and takingcorrective actions to control the identified risk…

关 键 词:Case-Based  System  风险因子  基于实例系统  知识工程  风险管理  建设项目  建筑工业

A Case-Based System for Construction Project Risk Management
YANG Lan-rong,ZHANG Jin-long.A Case-Based System for Construction Project Risk Management[J].Journal of Systems Science and Systems Engineering,2002,11(4):419-424.
Authors:YANG Lan-rong  ZHANG Jin-long
Institution:School of Public Administration, Huazhong University of Science and Technology, Wuhan 430074, China
Abstract:This paper presents a Case-Based system for assisting construction project managers in identifying risk factors and the corresponding construction project risk. The construction project risk identification model captures the case, acquired from previous completed construction projects and experience. A prototype is developed based on the proposed Case-Based system to determine risk factors along with their risk effects.
Keywords:case-based  risk management
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号