首页 | 本学科首页   官方微博 | 高级检索  
     


Modification Management for Construction Processes
Authors:Wolfgang Huhnt  Sven Richter  Felix Enge
Affiliation:Institute of Civil Engineering, Berlin Institute of Technology
Abstract:This paper presents an approach to handle different types of subsequent modifications in construction processes. It is focused on a formalized approach with the objective that effects of subsequent modifications are detected automatically. The approach presented in this paper makes use of an existing modeling technique specifically focused on construction processes. The modeling techniques result in a process description where all technological interdependencies between construction activities are considered and where consistency between the sequence of activities and the history of components is guaran-teed. This modeling technique is expanded by an existing concept for handling versions and dependencies between objects. The integration of these different concepts makes it possible to track effects of relevant types of subsequent modifications in construction processes on a formalized basis. Effects of subsequent modifications are detected by algorithms, different versions can be compared by algorithms and different versions are stored so that subsequent modifications are documented. The innovation of the approach presented is the completeness. Effects of different relevant types of subsequent modifications in construction processes are tracked on a formalized basis.
Keywords:construction processes  process modeling  subsequent modifications
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号