首页 | 本学科首页   官方微博 | 高级检索  
     

煤峪口矿307盘区工作面顶板管理
引用本文:姜旺. 煤峪口矿307盘区工作面顶板管理[J]. 科技情报开发与经济, 2006, 16(16): 266-267
作者姓名:姜旺
作者单位:同煤集团煤峪口矿,山西,大同,037003
摘    要:分析了采煤工作面机道漏顶的原因,提出了加强支架维修力度、加强现场管理和工人技术培训、加强矿压观测等加强顶板管理的措施。

关 键 词:采煤工作面  漏顶  顶板管理  矿压观测
文章编号:1005-6033(2006)16-0266-02
收稿时间:2006-03-10
修稿时间:2006-03-10

Management of the Roof of 307 Panel Working Face in Meiyukou Coalmine
JIANG Wang. Management of the Roof of 307 Panel Working Face in Meiyukou Coalmine[J]. Sci-Tech Information Development & Economy, 2006, 16(16): 266-267
Authors:JIANG Wang
Abstract:This paper analyzes on the reasons of the roof leakage on the machine road in the coal face,advances the measures of strengthening the roof management such as strengthening the support maintenance,strengthening the field management and worker's technical training,and strengthening the mineral pressure observation,etc.
Keywords:coal face  roof leakage  roof management  mineral pressure observation
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号