Technical Breakthroughs in the Construction of TGP
作者姓名:Zhang Chaoran  Dai Huichao
作者单位:China Yangtze TGP Development Corporation,Yichang,Hubei 443002
摘    要:1Introduction TheThreeGorgesProject(TGP)isavitalbackboneprojectinthedevelopingandharnessingoftheYangtzeRiver.Asamulti purposehydro developmentprojectthatcanproducecomprehensivebenefitsmainlyinfloodcontrol,powergenerationandnavigationimprovement,TGPwillexertasignificantimpactonthenationalsocio economicdevelopmentofChinaafteritscompletion .Withthenormalpoollevel (NPL)at1 75m ,thereservoirhasatotalstoragecapacityof39 3billionm3 .Theprojectiscom posedofadam ,twopowerplantsandnavigationfacil…

关 键 词:river  closure    cutoff  wall    high  slope    steel  lined  reinforced  concrete    temperature  and  pressure  maintenance    asphalt  concrete  core  wall    turbine  generating  units

Technical Breakthroughs in the Construction of TGP
Zhang Chaoran,Dai Huichao.Technical Breakthroughs in the Construction of TGP[J].Engineering Sciences,2003,1(1):8-14.
Authors:Zhang Chaoran  Dai Huichao
Institution:China Yangtze TGP Development Corporation, Yichang, Hubei 443002
Abstract:The huge Three Gorges Project is technically complex. Quite a lot of technical breakthroughs have been made in such issues as river closure of the Grand Channel and the concrete construction of the cutoff wall, prompt concrete construction of the dam, high slope construction of the permanent shiplock, the large scale steel lined reinforced concrete penstocks of the power station, and the temperature and pressure maintenance of the spiral case, the asphalt concrete core wall, the metal works of the shiplock, and turbine generating units.
Keywords:river closure  cutoff wall  high slope  steel  lined reinforced concrete  temperature and pressure maintenance  asphalt concrete core wall  turbine generating units