浅谈后浇带的设计与施工
引用本文:张韦.浅谈后浇带的设计与施工[J].科技情报开发与经济,2005,15(22):293-294.
作者姓名:张韦
作者单位:山西省建筑设计研究院,山西太原,030013
摘    要:建筑施工中,由于超长或建筑物高低层给结构带来的不利影响,当增大结构伸缩缝间距或者不设置伸缩缝时,常采用设置施工后浇带这种措施,防止结构开裂。介绍了后浇带的设计和后浇带施工中的要求。

关 键 词:建筑施工  后浇带  后浇带设计  后浇带施工  伸缩缝
文章编号:1005-6033(2005)22-0293-02
收稿时间:2005-08-06
修稿时间:2005年8月6日

Talking about the Design and Construction of the Post-grouting Belt
ZHANG Wei.Talking about the Design and Construction of the Post-grouting Belt[J].Sci-Tech Information Development & Economy,2005,15(22):293-294.
Authors:ZHANG Wei
Abstract:In the buildings' construction, because of the unfavorable influence of the overlength or the high-low stories of the buildings on the structure, when the separation of structural expansion joints are increased or the expansion joints aren't set up, the measure of setting up the post-grouting belts is often adopted to prevent the cracks of the structure. This paper introduces the design of the post-grouting belts and some requirements for the construction of the post-grouting belts.
Keywords:building's construction  post-grouting belts  design of post-grouting belts  construction of post-grouting belts  expansion joints