首页 | 本学科首页   官方微博 | 高级检索  
     检索      

基于设备驱动的综合柔性调度冲突调解算法
引用本文:谢志强,周含笑,于洁,桂忠艳.基于设备驱动的综合柔性调度冲突调解算法[J].北京理工大学学报,2014,34(11):1150-1156.
作者姓名:谢志强  周含笑  于洁  桂忠艳
作者单位:哈尔滨理工大学计算机科学与技术学院,黑龙江,哈尔滨150080;哈尔滨理工大学计算机科学与技术学院,黑龙江,哈尔滨150080;哈尔滨理工大学计算机科学与技术学院,黑龙江,哈尔滨150080;哈尔滨理工大学计算机科学与技术学院,黑龙江,哈尔滨150080
基金项目:国家自然科学基金资助项目(60873019,61370086);黑龙江省自然科学基金资助项目(F201101);黑龙江省教育厅科技项目(12531105);哈尔滨市优秀学科带头人项目(2010RFXXG054);现代制造技术与刀具开发黑龙江省高校重点实验室开放课题(2012DJ-003);全国高等学校计算机教育研究会资助项目(ER2014018);黑龙江省博士后科研启动项目(LBH-Q13092)
摘    要:设备驱动时刻按最短加工用时确定工序设备,为避免两个设备选择同一工序发生冲突导致可调度工序延迟完成影响调度结果的问题,提出基于设备驱动的综合柔性调度冲突调解算法. 该算法分别从可调度工序集中为发生冲突的两个空闲设备选择加工时间次短的预调度工序,通过对可能加工的组合方案预调度,选择设备驱动时刻尽早结束的组合方案调度;当存在一个空闲设备有多个可调度最短加工工序时,采用实质短路径策略确定调度工序. 分析和实例表明,本文算法可缩短存在设备/工序选择冲突的综合柔性调度总加工时间. 

关 键 词:综合柔性调度  设备驱动  冲突调解  设备/工序选择冲突  实质短路径
收稿时间:4/1/2013 12:00:00 AM

Conflict Mediation Algorithm of the Integrated Flexible Scheduling Based on Device Driver
XIE Zhi-qiang,ZHOU Han-xiao,YU Jie and GUI Zhong-yan.Conflict Mediation Algorithm of the Integrated Flexible Scheduling Based on Device Driver[J].Journal of Beijing Institute of Technology(Natural Science Edition),2014,34(11):1150-1156.
Authors:XIE Zhi-qiang  ZHOU Han-xiao  YU Jie and GUI Zhong-yan
Institution:College of Computer Science and Technology, Harbin University of Science and Technology, Heilongjiang, Harbin 150080, China
Abstract:At the device driver moment, short time strategy has been used to confirm processing devices for procedures, in order to avoid the conflict caused by two devices select the same short processing time that will delay the completion time for the procedures, the conflict mediation algorithm of the integrated flexible scheduling based on the device driver has been proposed. The proposed algorithm selects the second shortest processing procedure from schedulable procedures set as the pre-scheduling procedure for the two conflict devices, by comparing the pre-scheduling results for the possible combining schemes, selects the combining scheme which finish as early as possible. When the free device has multiple schedulable shortest processing procedures, the algorithm uses the dynamic essential short path strategy to confirm the schedulable procedures. Analysis and examples have shown that the proposed algorithm can reduce the total processing time of the integrated flexible scheduling with device/procedure select confliction.
Keywords:integrated flexible scheduling  device driver  conflict mediation  device/procedure select confliction  essential short path
本文献已被 CNKI 万方数据 等数据库收录!
点击此处可从《北京理工大学学报》浏览原始摘要信息
点击此处可从《北京理工大学学报》下载免费的PDF全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号