摘    要:屯兰河大桥属山西省重点工程古交电厂的配套工程,具有承载负荷大、水文情况复杂、工期要求紧的特点。因此,在设计中按照安全、经济、便于施工的原则。结合电厂的使用特点,进行了有针对性的设计,达到了使用上的功能要求。

关 键 词:屯兰河大桥  斜交正做  先张梁  伸缩缝
文章编号:1005-6033(2005)12-0257-02
修稿时间:2005年4月6日

The Design of the Tunlanhe Bridge of Gujiao Electric Power Plant
RUAN Wen-zhong.The Design of the Tunlanhe Bridge of Gujiao Electric Power Plant[J].Sci-Tech Information Development & Economy,2005,15(12):257-258.
Authors:RUAN Wen-zhong
Institution:RUAN Wen-zhong
Abstract:The Tunlanhe Bridge, which is an accessory work of the Gujiao Electric Power Plant, one the major projects of Shanxi Province, possesses the features of the heavy load, and the short time limit, etc. Therefore, the corresponding design has been made according to the principles of the safety, economy and convenient construction and connecting with the application features of the electric power plant, satisfying the functional requirements in the application.
Keywords:Tunlanhe Bridge  bridge design  pretensioned beam  expansion joint