首页 | 本学科首页   官方微博 | 高级检索  
     

桥梁桩基冬季混凝土施工控制
引用本文:梁左生. 桥梁桩基冬季混凝土施工控制[J]. 科技情报开发与经济, 2004, 14(10): 328-329
作者姓名:梁左生
作者单位:山西省晋中路桥建设有限公司
摘    要:
简要介绍了桥梁桩基工程的概况和施工条件,根据混凝土冬季施工要求,通过采取有效的加热水温、材料保温、运输保温等措施,保证了灌注桩基的施工质量。

关 键 词:桥梁工程 桩基 混凝土施工 温度控制
文章编号:1005-6033(2004)10-0328-02
修稿时间:2004-06-11

Bridge Pile Foundation''''s Winter Concrete Construction Control
LIANG Zuo-sheng. Bridge Pile Foundation''''s Winter Concrete Construction Control[J]. Sci-Tech Information Development & Economy, 2004, 14(10): 328-329
Authors:LIANG Zuo-sheng
Affiliation:LIANG Zuo-sheng
Abstract:
This paper briefly introduces the general situation and constructi on condition of the bridge pile foundation, according to the winter concrete const ruction requirement, through adopting effective measures of increasing the water temperature, and making heat preservation for materials and transportation, etc ., the construction quality of the driven cast-in-place pile is guaranteed.
Keywords:bridge engineering  pile foundation  concrete construction  tempera ture control
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号