首页 | 本学科首页   官方微博 | 高级检索  
     检索      

珠江电厂1000MW机组给水泵的优化配置
引用本文:杨俊.珠江电厂1000MW机组给水泵的优化配置[J].科技信息,2013(7):403-404.
作者姓名:杨俊
作者单位:广州发展南沙电力有限公司,广州南沙511457
摘    要:本文针对珠江电厂1台1000MW机组扩建工程,分析了取消电动给水泵及分析汽动给水前置泵在超超临界1000MW机组汽机系统中的优化配置。对超超临界1000MW机组给水泵优化配置具有借鉴意义。

关 键 词:1000MW机组  电动给水泵  给水前置泵  优化配置

The Optimal Configuration of the 1000MW Unit Water Supply Pump in Zhujiang Power Plant
YANG Jun.The Optimal Configuration of the 1000MW Unit Water Supply Pump in Zhujiang Power Plant[J].Science,2013(7):403-404.
Authors:YANG Jun
Institution:YANG Jun (Guangzhou Development Nansha Electrical Power Co., Ltd, Nansha, Nansha Guangzhou, 511457)
Abstract:This article is about the expansion project of the 1000MW unit in Zhujiang Power Plant.It analyses the optimal configuration of cancelling motor-driven water supply pump and steam-driven water supply forepump in the supercritical 1000MW unit steam engine system. It has great significance for the optimal configuration of the supercritical 1000MW unit water supply pump.
Keywords:The 1000MW unit  Motor-driven water supply pump  Water supply forepump  Optimal configuration
本文献已被 维普 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号