面向板材渐进成形工艺的单元路径生成
引用本文:李敏,张李超,莫健华,吕言.面向板材渐进成形工艺的单元路径生成[J].华中科技大学学报(自然科学版),2012,40(1):1-5.
作者姓名:李敏  张李超  莫健华  吕言
作者单位:1. 华中科技大学材料成形与模具技术国家重点实验室,湖北武汉,430074
2. 株式会社网野,日本静冈县418—0004
基金项目:国家自然科学基金资助项目(50175034,50875093)
摘    要:针对板材渐进成形工艺成形时间长的问题,提出一种基于单元的成形路径生成方法.首先,分析适用于渐进成形工艺的单元路径规划原则;然后,对数据模型进行分层计算得到一系列等高线刀位点轮廓,建立每层轮廓内的环之间的拓扑关系(C-Net结构),以及每层轮廓之间的拓扑关系(Z-C-Net结构);最后,结合单元路径规划原则,从Z-C-Net结构中提取出单元序列,并对各个单元实施合适的子路径规划,以及子路径之间实施合理的连接,使成形路径最短.实例计算结果表明:应用单元路径规划与等高线路径规划相比,可节约22.5%的成形时间.

关 键 词:板材渐进成形  单元路径规划  扩展单元  刀位点轮廓  连接

Unit tool-path generation using sheet metal incremental forming process
Institution:Li Min1 Zhang Lichao1 Mo Jianhua1 L Yan2(1 State Key Laboratory of Material Processing and Mould and Die Technology,Huazhong University of Science and Technology,Wuhan 430074,China;2 Amino Corporation,Shizuoka 418-0004,Japan)
Abstract:As sheet metal incremental forming(IF) process would require a long time process,thus a unit tool-path generation method was presented.First,the applicable unit tool-path planning(UTPP) principle for IF was analyzed.Second,the triangular mesh model was sliced and a series of Z-constant cutter location contours(CLC) was calculated,and then the topological relations between the contours in every CLC(C-Net data structure) and between all CLCs(Z-C-Net data structure) were built.Finally,combined with the UTPP principle,the total length of the tool-paths was minimized by extracting the unit sequence from the Z-C-Net data structure,performing every unit with suitable sub-path planning style,and the valid linking paths among the sub-paths was obtained.Several examples prove that compared with the Z-constant tool-path generation algorithm in the IF,the unit tool-path generation algorithm can save as much as 22.5% process time cost.
Keywords:sheet metal incremental forming  unit tool-path planning  extended unit  cutter location contours  linking