摘    要:根据江西省某铜矿酸性污水库的地质勘探资料,对该污水库的坝体、坝基和坝肩进行有限元渗流计算及坝坡抗滑稳定性计算,分析大坝的渗流情况、渗透变形和稳定性问题,并提出相应的防渗加固措施。计算结果表明:大坝渗漏主要由坝肩和坝体渗漏、坝基渗流、粘土防渗斜墙失效和反滤层堵塞等引起,在渗透情况下坝体安全系数为1.012;采用高压摆喷灌浆和粘土固化注浆技术综合治理后,坝区的总渗水量降低90%,在设计洪水位条件下坝体安全系数为1.520,说明所提出的措施合理、可靠。

关 键 词:酸性污水库  土石坝  渗流  稳定性  加固  有限元法
文章编号:1672-7207(2006)06-1171-06
收稿时间:2006-04-27
修稿时间:2006年4月27日

Seepage and stability analysis and reinforcement of earth rock-fill dam of acidic wastewater reservoir
CHEN Yong-gui,ZHANG Ke-neng,ZOU Yin-sheng.Seepage and stability analysis and reinforcement of earth rock-fill dam of acidic wastewater reservoir[J].Journal of Central South University:Science and Technology,2006,37(6):1171-1176.
Authors:CHEN Yong-gui  ZHANG Ke-neng  ZOU Yin-sheng
Institution:1 Institute of Geotechnical Engineering, Changsha University of Science and Technology, Changsha 410076, China; 2. School of Civil Engineering, Hunan University, Changsha 410082, China; 3 School of Geosciences and Environmental Engineering, Central South University, Changsha 410083, China
Abstract:Based on geological information of the earth rock-fill dam of acidic wastewater reservoir in Jiangxi Province, the seepage finite element calculation was conducted for dam body, dam foundation and side bank, and the dam slope stability analysis was made for the reservoir. The leakage and the percolation failure as well as the dam slope stability problem were discussed firstly; then the measures to anti-seepage and reinforce the dam were proposed. The results show that the seepage comes from dam body, dam foundation, side bank, failure of the clay anti-seepage wall and the blockage of anti-filter dam. The safety coefficient of the dam is 1. 012 under seepage and it turns to 1.520 after the dam is reinforced by high pressure jet grouting and clay-solidified grouting. The anti-seepage rate of 90% shows that the reinforcement is feasible and rational.
Keywords:acidic wastewater reservoir  earth rock-fill dam  seepage  stability  reinforcement  finite element method