风积沙土方路基试验段施工技术的探讨
引用本文:李志明.风积沙土方路基试验段施工技术的探讨[J].科学之友,2009(7):64-65.
作者姓名:李志明
作者单位:太原市市政工程总公司;
摘    要:通过对试验段的施工来确定风积沙填料的最佳含水量、适宜的松铺厚度和相应的碾压遍数、最佳的施工机械组合和施工组织以及操作工艺,具体确定各种施工技术参数。全面检测试验段施工质量,验证施工方案的可行性和有效性,确定最佳施工方案,为全线施工作技术储备,并指导全线施工。

关 键 词:风积沙  路基  施工

Aeolian Sand Subgrade Test of the Construction Technology
Li Zhiming.Aeolian Sand Subgrade Test of the Construction Technology[J].Friend of Science Amateurs,2009(7):64-65.
Authors:Li Zhiming
Abstract:Test section of the construction to determine the aeolian sand fill the best water,and suitable for the thickness of the Pine Shop RCC and the corresponding number of times,the best combination of construction machinery and construction organizations,as well as operation of technology,construction technology to identify specific parameters.Comprehensive construction quality tests to verify the feasibility of construction and effectiveness of the program,determine the best implementation plan,the work of the...
Keywords:aeolian sand  subgrade  construction  