Improved differential evolution algorithm for resource-constrained project scheduling problem
Authors:Lianghong Wu  Yaonan Wang  Shaowu Zhou
Institution:1. College of Information and Electrical Engineering, Hunan University of Science and Technology, Xiangtan 411201, P. R. China;College of Electrical and Information Engineering, Hunan University, Changsha 410082, P. R. China
2. College of Electrical and Information Engineering, Hunan University, Changsha 410082, P. R. China
3. College of Information and Electrical Engineering, Hunan University of Science and Technology, Xiangtan 411201, P. R. China
Abstract:An improved differential evolution (IDE) algorithm that adopts a novel mutation strategy to speed up the convergence rate is introduced to solve the resource-constrained project scheduling problem (RCPSP) with the objective of minimizing project duration. Activities priorities for scheduling are represented by individual vectors and a serial scheme is utilized to transform the individual-represented priorities to a feasible schedule according to the precedence and resource constraints so as to be evaluated. To investigate the performance of the IDE-based approach for the RCPSP, it is compared against the meta-heuristic methods of hybrid genetic algorithm (HGA), particle swarm optimization (PSO) and several well selected heuristics. The results show that the proposed scheduling method is better than general heuristic rules and is able to obtain the same optimal result as the HGA and PSO approaches but more efficient than the two algorithms.  
Keywords:differential evolution algorithm  project scheduling  resource constraint  priority-based scheduling
本文献已被 维普 万方数据 等数据库收录!
点击此处可从《系统工程与电子技术(英文版)》浏览原始摘要信息
点击此处可从《系统工程与电子技术(英文版)》下载免费的PDF全文