首页 | 本学科首页   官方微博 | 高级检索  
     检索      

两层供应链三级库存系统共同生产补货及协调策略
引用本文:赵菊,周永务.两层供应链三级库存系统共同生产补货及协调策略[J].系统工程理论与实践,2012,32(10):2163-2172.
作者姓名:赵菊  周永务
作者单位:1. 合肥工业大学 管理学院, 合肥 230009; 2. 过程优化与智能决策教育部重点实验室, 合肥 230009; 3. 华南理工大学 工商管理学院, 广州 510641
基金项目:国家自然科学基金(70971041,71072165,71101002);国家社会科学基金(12CGL041;10CGL024);合肥工业大学博士学位专项基金(2012HGBZ0197)
摘    要:考虑了一个基于MTS生产方式的制造商和一个销售多种物品的零售商构成的两层供应链, 研究了由制造商原材料、产成品和零售商商品构成的三层库存系统的多物品生产和补货问题. 建立三种生产-补货模型, 研究了供应链上下游企业合作和多物品之间共同生产补货对供应链及其成员的成本的影响. 研究了模型的最优解特性, 给出了搜索算法. 数值仿真实验结果表明: 合作策略下多物品共同生产补货策略总是 使制造商和供应链的总成本最低, 非合作策略下多物品共同生产补货策略总是使零售商总成本最低.最后, 给出一个延迟支付策略, 实现了供应链协调.

关 键 词:共同补货  供应链协调  多级库存控制  MTS生产方式  延迟支付  
收稿时间:2010-07-21

Joint replenishment and channel coordination policy for two echelon supply chain with multi-echelon inventory system
ZHAO Ju,ZHOU Yong-wu.Joint replenishment and channel coordination policy for two echelon supply chain with multi-echelon inventory system[J].Systems Engineering —Theory & Practice,2012,32(10):2163-2172.
Authors:ZHAO Ju  ZHOU Yong-wu
Institution:1. School of Management, Hefei University of Technology, Hefei 230009, China; 2. Key Laboratory of Process Optimization and Intelligent Decision-making, Ministry of Education, Hefei 230009, China; 3. School of Business Administration, South China University of Technology, Guangzhou 510641, China
Abstract:A multi-item joint replenishment problem is discussed for a two-echelon supply chain,which consists of a MTS(make to stock) manufacturer and a retailer selling multiple items.The three-echelon inventory system includes manufacture’s raw material and finished product and retailer’s product.Three replenishment models are formulated to study the impact of multi-echelon cooperation and multi-product joint replenishment on the total cost of the channel and the parties.The properties of the optimal solutions for the proposed models are then analyzed.Numerical simulations show that model JC(both the manufacturer and the retailer make the joint replenishment policy jointly) performs better in reducing the average total cost of supply chain,as well as the manufacturer,as compared to model JN(the manufacturer and the retailer make joint replenishment policy individually).But it is just reverse for the retailer.In addition,permissible delay in payment is adopted to achieve the coordination of supply chain.
Keywords:joint replenishment  supply chain coordination  multi-echelon inventory control  make-to-stock  delay in payment
本文献已被 CNKI 等数据库收录!
点击此处可从《系统工程理论与实践》浏览原始摘要信息
点击此处可从《系统工程理论与实践》下载免费的PDF全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号