首页 | 本学科首页   官方微博 | 高级检索  
     检索      

海上风力发电项目建设及施工管理的研究
引用本文:程亮.海上风力发电项目建设及施工管理的研究[J].科技资讯,2014(5):51-52.
作者姓名:程亮
作者单位:中国水利电力物资上海公司 ,上海 200063
摘    要:我国海上风力发电行业进入"加速期"。文章介绍了不同类型的海上风机基础型式、海上风机安装方式。研究了两种施工方案所需要的施工周期,并对我国的海上施工能力(如:打桩、起吊设备及船舶)做出了分析。

关 键 词:海上风电  基础结构  施工能力

Research on Management of Construction of off-shore Windfarm
Cheng Liang.Research on Management of Construction of off-shore Windfarm[J].Science & Technology Information,2014(5):51-52.
Authors:Cheng Liang
Institution:Cheng Liang (China National Water Resources &z Electric Power Materials &z Equipment Shanghai Corporation,Shanghai,200063,China)
Abstract:Off-shore wind-power industry in China has come into a "boost--up" period. This paper introduces several kinds of foundation structures and erraction of off-shore windturbine and two ways of erraction of wind turbine.This studies the congstruction period and also analyze the construction capability(e.g.hammering and hoisting equipment and ships)of off--shore windfarm in China.
Keywords:Off-shore Wind Farm  Foundation Structure  Construction Capability
本文献已被 CNKI 维普 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号