首页 | 本学科首页   官方微博 | 高级检索  
     

综放全厚开采20 m特厚中硬煤层数值模拟研究
引用本文:王吉生,柴肇云,康天合,李义宝. 综放全厚开采20 m特厚中硬煤层数值模拟研究[J]. 太原理工大学学报, 2007, 38(2): 175-179
作者姓名:王吉生  柴肇云  康天合  李义宝
作者单位:太原理工大学,采矿工艺研究所,山西,太原,030024
基金项目:山西省高等学校科研开发基金
摘    要:针对酸刺沟煤矿6-1号煤层的具体条件,基于矿山压力对顶煤的压裂作用,运用数值模拟方法系统研究了综放全厚开采20 m特厚中硬煤层的合理工作面长度和工艺参数。主要结论有:工作面前支承压力峰值随工作面推进距离增大而变化;工作面前支承压力峰值随工作面长度的增加而增大;顶煤破坏系数随工作面推进距离和工作面长度的增加而变化。考虑矿山压力对顶煤的压裂作用,20m特厚中硬煤层综放工作面的长度应大于300 m;建议综放全厚开采20 m特厚中硬煤层的底层工作面应采用4.5 m的大采高;支架合力作用点位置和支架阻力对顶煤压裂和支护系统的稳定性起着十分重要的作用;给出了合理的开采工艺参数及其匹配。

关 键 词:20m特厚煤层  综放全厚开采  工作面长度  工艺参数  顶煤压裂
文章编号:1007-9432(2007)02-0175-05
收稿时间:2006-10-10
修稿时间:2006-10-10

Numerical Simulation of Full-seam Mining for a 20 m Very Thick and Medium hard Seam by Fully Mechanized Sublevel Caving
WANG Ji-sheng,CHAI Zhao-yun,KANG Tian-he,Li Yi-bao. Numerical Simulation of Full-seam Mining for a 20 m Very Thick and Medium hard Seam by Fully Mechanized Sublevel Caving[J]. Journal of Taiyuan University of Technology, 2007, 38(2): 175-179
Authors:WANG Ji-sheng  CHAI Zhao-yun  KANG Tian-he  Li Yi-bao
Affiliation:Institute of Mining Technology, Taiyuan University of Technology, Taiyuan 030024, China
Abstract:According to the condition of No.6-1 seam of Suancigou mine,the rational working face length and technology parameters of the full-seam mining for a 20 m very thick and medium hard seam by fully mechanized sublevel caving mining have been systematically studied by using numerical simulation based on the fracture effect of ground pressure to top coal.The main testing conclusions are as follows:working face front abutment pressure peak value varies with its advancing distance increasing;face front abutment pressure peak value increases with face length increasing;top coal failure coefficient varies with face advance distance and face length,the fully mechanized sublevel caving face length for 20m very thick and medium hard seam should be over 300m;4.5 m great bottom cutting height is suggested for the fully mechanized sublevel caving face of 20m very thick and medium hard seam;the position of the composite force effect point and the support resistance force of the powered support in the face will play a very important role in top coal fracture and support system stability;the rational mining technology parameters and their match for the fully mechanized sublevel caving face of 20 m very thick and medium hard seam are suggested.
Keywords:20 m very thick seam  full-seam mining by fully mechanized sub-level caving mining  working face length  technology parameters  top coal fracture
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号