首页 | 本学科首页   官方微博 | 高级检索  
     检索      

露天坑排尾对采空区影响的数学预测及其稳定性
引用本文:史秀志,陈佳耀,周健,邱贤阳.露天坑排尾对采空区影响的数学预测及其稳定性[J].东北大学学报(自然科学版),2017,38(4):591-597.
作者姓名:史秀志  陈佳耀  周健  邱贤阳
作者单位:(中南大学 资源与安全工程学院, 湖南 长沙410083)
基金项目:“十二五”国家科技支撑计划项目(2013BAB02B05).
摘    要:为揭示露天坑干堆排尾堆高(H)对采空区跨度(D)与境界顶柱高(h)的影响,采用FLAC3D对不同跨度的双空区在尾砂回填过程中进行开挖模拟,并结合曲线拟合、传统破坏判据及厚度折减法,分别对地下双空区的受力、塑性区及关键点位移等特征进行分析及数学预测.研究表明:当D不变时,拉、压应力及塑性区面积均随H的增大而增加,且在D20 m后位移变化率明显增大;当H不变时,监测位移和塑性区随D增大而增加,且定量预测出D=26 m时,上下空区临界破坏对应的H分别为182.44,189.85 m.当D与H均变化时,双空区的塑性区逐渐呈现"蝴蝶状",上部空区的塑性区域明显大于下部,且在D20 m,H150 m时,上部空区出现与露天坑底贯穿现象.

关 键 词:露天坑排尾  双空区  境界顶柱  数值模拟  数学预测  

Mathematical Prediction on Effect of Tailing Discharge of Open-Pit on Stability of Underground Mined Out Area
SHI Xiu-zhi,CHEN Jia-yao,ZHOU Jian,QIU Xian-yang.Mathematical Prediction on Effect of Tailing Discharge of Open-Pit on Stability of Underground Mined Out Area[J].Journal of Northeastern University(Natural Science),2017,38(4):591-597.
Authors:SHI Xiu-zhi  CHEN Jia-yao  ZHOU Jian  QIU Xian-yang
Institution:School of Resources and Safety Engineering, Central South University, Changsha 410083, China.
Abstract:To reveal the impact of the height of the tailing dry stacked gangue (H) on the span of double gob area (D) and the roof thickness (h), the simulation software FLAC3D was used to simulate the excavation process of the double gob area of different spans during the tailing-backfilling process. The stress, plastic zones and the displacement of monitoring points of double gob area were analyzed by combining with the hyperbolic fitting equations, traditional failure criterion and the thickness reduction methods. When D is kept constant, tensile and compressive stress and the plastic zone area increase with the increase of H, and the displacement of all monitoring points increase significantly when the span is larger than 20m. When H is kept constant, the displacement and the plastic zone area increase with the increase of D, and it can be quantitatively predicted that when the span is up to 26m, the critical damage height of tailing dry stacked gangue is 182.44 and 189.85m, respectively. When D and H are changed, the plastic zones of the double gob area take on a butterfly-shape, and the plastic zone area of the upper gob is greater than that of the lower part. A cutting-through failure will occur when the span exceeds 20m and the tailing height exceeds 150m.
Keywords:tailing discharge into open-pit  double gob area  boundary pillar  numerical simulation  mathematical prediction  
本文献已被 CNKI 等数据库收录!
点击此处可从《东北大学学报(自然科学版)》浏览原始摘要信息
点击此处可从《东北大学学报(自然科学版)》下载免费的PDF全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号