首页 | 本学科首页   官方微博 | 高级检索  
     检索      

连续开挖诱导断层活化顶板突水机制的模拟分析
引用本文:师文豪,杨天鸿,刘洪磊,赵永川.连续开挖诱导断层活化顶板突水机制的模拟分析[J].东北大学学报(自然科学版),2017,38(11):1623-1627.
作者姓名:师文豪  杨天鸿  刘洪磊  赵永川
作者单位:(东北大学 资源与土木工程学院, 辽宁 沈阳110819)
基金项目:国家重点基础研究发展计划项目(2013CB227902); 国家自然科学基金资助项目(51574059,51404067).
摘    要:以中关铁矿采动断层突水为例,对连续开挖过程断层活化顶板突水进行有限元模拟,从力学角度研究断层带应力和损伤区迁移过程,分析断层活化机制.研究表明:连续开挖是造成断层损伤区产生、累积扩展到贯通的主要诱因;随着开挖推进断层带内剪应力集中区域沿断层从上到下逐渐向顶板转移,断层损伤区状态由压剪变为拉剪,并不断扩展;损伤区在断层揭露时完全贯通,形成导水通道并诱发突水灾害.因此,对于工作面前方的非导水断层,采用水平超前钻孔未必能查明断层活化导水情况,为确保安全,需补充斜向上钻孔,探查更高位置断层的导水性.

关 键 词:开挖  断层活化  突水  数值模拟  中关铁矿  

Numerical Simulation on the Mechanism of Fault Reactivation Induced Water Inrush Associated with the Excavating Process
SHI Wen-hao,YANG Tian-hong,LIU Hong-lei,ZHAO Yong-chuan.Numerical Simulation on the Mechanism of Fault Reactivation Induced Water Inrush Associated with the Excavating Process[J].Journal of Northeastern University(Natural Science),2017,38(11):1623-1627.
Authors:SHI Wen-hao  YANG Tian-hong  LIU Hong-lei  ZHAO Yong-chuan
Institution:School of Resources & Civil Engineering, Northeastern University, Shenyang 110819, China.
Abstract:A case of water inrush through fault induced by mining in Zhongguan iron mine was studied by the finite element simulation. The fault stress and damage zones were analyzed to study the mechanism of fault reactivation-induced water inrush. The simulation results illustrate that the excavating process is the cause of damage zones initiation, accumulation, extension and coalescence. The fault shear stress concentration moves from the top downward to roof gradually. The compression-shear damage zone in the fault changes to tension-shear damage zone and grows gradually. When the fault is fully exposed, the connected damage zone provides a channel for the groundwater outburst and finally causes the inrush incident. Therefore, the conductivity of the natural waterproof fault cannot be completely confirmed by horizontal cover hole before excavations. To be safe, more acclivitous cover holes should be drilled to probe the conductivity of the fault in the higher positions for the further confirmation.
Keywords:excavation  fault reactivation  water inrush  numerical simulation  Zhongguan iron mine  
本文献已被 CNKI 等数据库收录!
点击此处可从《东北大学学报(自然科学版)》浏览原始摘要信息
点击此处可从《东北大学学报(自然科学版)》下载免费的PDF全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号