首页 | 本学科首页   官方微博 | 高级检索  
     检索      

Study and Application of Health Care Measure in Tunnel Construction of Qinghai-Tibet Railway
作者姓名:Ding  Shouquan  Liu  Yingshu  Jia  Jianhou  Liang  Bozhou  Qiu  Changchun  Zhou  Wenyu  Dai  Ruichen  Li  Dan  Yang  Xiaolan  Li  Yi  Tang  Wei  Zhu  Yongquan
作者单位:[1]China Railway 20 Bureau Group CO., Xian 710016;2- 10^* [2]University of Science and Technology Beijing, China [3]China Railway Department, China [4]Institute of Basic Medical Sciences of the Chinese Academy of Medical Sciences (CAMS), China [5]Headquarters of China Qinghai-Tibet Railway, China [6]China Peking University, China [7]Beijing huakang Hi-Tech Co., Ltd, China [8]China Academy of Railway Science, Ltd, China [9]Beijing Peking Xianfeng Technology Co., Ltd, China [10]Shijiazhuang Railway Institute, China.
摘    要:1Overview FenghuoshanTunnelProjectwasakeycontrol projectinQinghai TibetRailwayconstruction.It wasarailwaytunnelofthehighestelevationintheworldwithrailheadlevel4905mandtotallength1338m.Table1Railwaytunnelofhighaltitudeintheworld TunnelnameGuanjiaotunnelYangbajingtunnelKunlunshantunnelJialiertunnelFenghuoshantunnel Sealevelelevation m36984313450046804905NationalityChinaChinaChinaPeruChina Constructiondecade19782003200218932002TheFenghuoshanwasstyled“lifeforbidden zone”.Itsannualaverag…

关 键 词:青藏铁路  铁路隧道  建筑质量测量  隧道维护
收稿时间:2006-04-03

Study and Application of Health Care Measure in Tunnel Construction of Qinghai-Tibet Railway
Ding Shouquan Liu Yingshu Jia Jianhou Liang Bozhou Qiu Changchun Zhou Wenyu Dai Ruichen Li Dan Yang Xiaolan Li Yi Tang Wei Zhu Yongquan.Study and Application of Health Care Measure in Tunnel Construction of Qinghai-Tibet Railway[J].Engineering Sciences,2006,4(2):166-171.
Authors:Ding;Shouquan;Liu;Yingshu;Jia;Jianhou;Liang;Bozhou;Qiu;Changchun;Zhou;Wenyu;Dai;Ruichen;Li;Dan;Yang;Xiaolan;Li;Yi;Tang;Wei;Zhu;Yongquan
Abstract:In this paper we studied a key control project in Qinghai-Tibet system, the ventilatRailway construction. The project included the oxygen supplying ion and air changing system measure of tunnel environment, monitoring and comprehensive treatment on airborne dust and toxic and harmful gases, hygiene intervention with builders in Fenghuoshan Tunnel construction. In the worst sector of the whole Qinghai-Tibet Railway line, we acquired a good achievement of the lowest incidence rate of altitude disease. Hence the Fenghuoshan Tunnel was joined up in advance, which set up a new record for frozen soil tunnel construction at high altitudes. The application of health care measure for tunnel construction promised rapid results.
Keywords:Qinghai-Tibet Railway  tunnel construction health care measure
本文献已被 CNKI 维普 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号