Technology for long cable erection of a thousand meter scale cable stayed bridge
Authors:Rao Huarong  Deng Huibin
Affiliation:Wuhan Second Navigational Road and Bridge Special Engineering Co.;Ltd.;Wuhan 430071;China
Abstract:In the background of the construction of Sutong Yangtze River Bridge(short as Sutong Bridge),the cable construction method and techniques of a thousand-meter scale cable-stayed bridge are introduced.Some key construction techniques,such as outspreading cable on deck,installing cable at pylon,pulling and fixing cable at the attachment with decks and cable PE sheath protection are discussed.
Keywords:a thousand-meter scale cable-stayed bridge long cable  outspreading cable  the final scheme of construction technique for long cables  long cable construction  