变电站雨水泵站深基坑支护施工技术探讨
引用本文:徐荣华.变电站雨水泵站深基坑支护施工技术探讨[J].科技信息,2011(29):I0348-I0350.
作者姓名:徐荣华
作者单位:安徽省电力公司池州供电公司基建部;
摘    要:基于变电站雨水泵所处地形、地质及环境情况,对深基坑施工边坡稳定、两侧放坡、板桩支护、井点降水等多种方案进行分析对比,并在基坑施工中,对所采取的两侧钢板桩支护、井点降水、两侧放坡等施工技术进行分析和应用控制,以确保安全施工及最佳技经效能状况下进行深基坑施工。

关 键 词:雨水泵站  深基坑施工  钢板桩支护  井点降水  

A Study of Construction Techniques of Deep Foundation Pit for Storm Water Pumping Station of a Substation
Abstract:By comparing several possible construction plans,to analyze the stability of the pit slope to ensure the security before the construction of the pit,while during the operation process,to comprehensively apply such techniques as using pit steel piles to prop the pit,well-point dewatering,sloping on both sides in order to carry on the construction on the basis of security and economic optimization.
Keywords:Storm water pumping station  Construction of deep foundation pit  Steel sheet piles  Well-point dewatering  