首页 | 本学科首页   官方微博 | 高级检索  
     检索      

基于C/S模式的油藏地质方案设计系统研制
引用本文:程大勇,赵正文,时琼.基于C/S模式的油藏地质方案设计系统研制[J].中国西部科技,2009,8(31):16-17,21.
作者姓名:程大勇  赵正文  时琼
作者单位:西南石油大学,四川,成都,610500
摘    要:地质方案设计是油藏总体开发方案的重要组成部分,目前多数油田的设计方法主要是依靠手工查阅、统计和填写数据报表,设计结果以报表的形式呈现给审核人进行审核,待方案批准后,签发施工单通知施工。这种方法效率低,且存在设计误差影响施工效果。开发基于三层C/S模式的油藏地质方案设计系统直接有效地利用网络和数据库资源,减少设计误差,实现设计方案的自动生成、分发等工作,节省人力、物力资源。本文着重阐述了该系统的设计思想、系统功能和实现方法。该系统实现对油藏地质方案设计过程的自动控制,准确高效地完成方案设计,且可以自动升级、使用维护方便,具有较高的实用价值。

关 键 词:油藏地质  方案设计  C/S模式  系统

The Research of Reservoir Geological Project Design System Based on Three-Layer C/S Mode
CHENG Da-yong,ZHAO Zheng-wen,SHI Qiong.The Research of Reservoir Geological Project Design System Based on Three-Layer C/S Mode[J].Science and Technology of West China,2009,8(31):16-17,21.
Authors:CHENG Da-yong  ZHAO Zheng-wen  SHI Qiong
Institution:(Southwest Petroleum University, Sichuan 610500 ,China)
Abstract:Geological project design is an important part of reservoir overall development project. At present,the design work of most oilfields are mainly finished by hand to consult,count and fill in the data report to be audited. Then the project begins to construct after the approval. With low efficiency, its design error may also influence the construction. Reservoir geological project design system based on Three-Layer C/S Model makes use of network and database resources directly and efficiently. It not only reduces design errors,but also realizes automation of the design project, and thereby saves manpower and material resource, The design idea, system function and implementation method of the system are emphatically elaborated in this paper.With higher practical value and convenient operation and maintenance,this auto-update system realizes automatic control of the design process of reservoir geological project design and finishes the project design with high accuracy and efficiency.
Keywords:Reservoir geological  Project design  C/S Model  System
本文献已被 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号