首页 | 本学科首页   官方微博 | 高级检索  
     检索      

围岩流变特性对隧道二衬支护时机的影响
引用本文:周勇,柳建新,方建勤,柳群义.围岩流变特性对隧道二衬支护时机的影响[J].解放军理工大学学报,2012,0(2):178-182.
作者姓名:周勇  柳建新  方建勤  柳群义
作者单位:1.中南大学 地球科学与信息物理学院,湖南 长沙 410083; 2.湖南文理学院 资源环境与旅游学院,湖南 常德 415000; 3.同济大学 土木工程学院,上海 200092
基金项目:国家自然科学基金资助项目(50579088,60672042).
摘    要:为了研究岩体流变特性情况下隧道二衬的支护时机,首先推导了在考虑围岩流变特性时,衬砌抗力、位移及围岩的位移表达式;然后以广梧高速公路茶林顶隧道岩体为工程背景,探讨了考虑岩体流变情况下,隧道二衬支护时机的确定方法,并对比了围岩拱顶下沉实测值和理论计算值。结果表明:(1) 理论分析所建立的衬砌抗力、位移及围岩的位移表达式中均包含了时间参数,可确定达到不同衬砌抗力、位移及围岩位移所需要的时间;(2) 围岩拱顶下沉实测值和理论计算值表现出相同的发展规律,验证了所建立方法的正确性。

关 键 词:岩体流变特性  隧道  二衬支护时机
收稿时间:2010-03-31
修稿时间:2010-03-31.

Influence of rock mass rheological characteristic on tunnel second lining time
ZHOU Yong,LIU Jian-xin,FANG Jian-qin and LIU Qun-yi.Influence of rock mass rheological characteristic on tunnel second lining time[J].Journal of PLA University of Science and Technology(Natural Science Edition),2012,0(2):178-182.
Authors:ZHOU Yong  LIU Jian-xin  FANG Jian-qin and LIU Qun-yi
Institution:1.School of Geosciences and Info-Physics, Central South University, Changsha 410083, China; 2.College of Resource and Environment and Tourism, Hunan University of Arts and Science, Changde 415000, China; 3.Civil Engineering Department, Tongji University, Shanghai 200092, China
Abstract:To figure out the second lining time of the tunnel under the consideration of rock mass rheological characteristic, firstly, the equations of the lining resistant pressure, displacement and surrounding rock mass displacement were deduced when taking into consideration the rock mass rheological characteristic; secondly, the Chalinding tunnel engineering of the Guangdong Yunwu Highway was chosen as the study background, the determination method for the second lining time of the tunnel under the consideration of rock mass rheological characteristic was proposed, and the results of the monitoring value and analytical solution value for the arch settlement were compared. The analysis results show that the equations of the lining resistant pressure, displacement and surrounding rock mass displacement all consist of the factor of time, that the time needed to reache certain value of the lining resistant pressure, displacement and surrounding rock mass displacement can be determined,and that the disciplines of the arch settlement obtained from the proposed method are the same with that from the monitoring data, which validates the correctness of the proposed method.
Keywords:rock mass rheological characteristic  tunnel  second lining time
点击此处可从《解放军理工大学学报》浏览原始摘要信息
点击此处可从《解放军理工大学学报》下载免费的PDF全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号