首页 | 本学科首页   官方微博 | 高级检索  
     检索      

万家寨引黄工程北干线1号隧洞施工对沿线部分村庄水井的影响
引用本文:张志刚.万家寨引黄工程北干线1号隧洞施工对沿线部分村庄水井的影响[J].科技情报开发与经济,2009,19(20):154-156.
作者姓名:张志刚
作者单位:山西省水利水电勘测设计研究院,山西,太原,030024
摘    要:山西省万家寨引黄工程北干线1号隧洞沿线部分村庄水井枯竭,导致了附近村民吃水困难.通过对1号隧洞排水情况的调查,查找水井柘竭的原因,并采取相应的解决措施.

关 键 词:万家寨引黄工程  隧洞施工  水井  排水情况

Discussion on the Influences of the Construction of No.1 Tunnel of Northern Trunk in Wanzhanjiazhai YRDP on the Wells in Some Villages along the Line
ZHANG Zhi-gang.Discussion on the Influences of the Construction of No.1 Tunnel of Northern Trunk in Wanzhanjiazhai YRDP on the Wells in Some Villages along the Line[J].Sci-Tech Information Development & Economy,2009,19(20):154-156.
Authors:ZHANG Zhi-gang
Abstract:The wells in some villages along No.1 Tunnel of Northern Trunk in Wanzhanjiazhai YRDP dried up,which resulted in the shortage of drinking water for those villagers.Through investigating the drainage situation of No.1 Tunnel,this paper finds the reasons why the wells went dry,and takes some solving measures.
Keywords:Wanzhanjiazhai YRDP  tunnel construction  well  drainage situation  
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号