首页 | 本学科首页   官方微博 | 高级检索  
     

岩溶地区高层建筑砼桩复合地基运用分析
引用本文:谢晨. 岩溶地区高层建筑砼桩复合地基运用分析[J]. 甘肃科学学报, 2003, 15(Z1): 183-185
作者姓名:谢晨
作者单位:甘肃有色地质勘查局四队,甘肃,张掖,734012
摘    要:
通过某高层建筑实际工作资料,对岩溶发育地区地质勘察、施工手段、地基处理和基础方案选择作了运用分析,其中在地基处理上采用砼桩复合地基取得了较好的效果,为岩溶地区覆盖土的加固处理提供了一个可借鉴的方法.

关 键 词:基础方案的选择  砼桩复合地基  地基加固处理
文章编号:1004-0366(2003)S1-0183-03
修稿时间:2003-03-14

ANALYSES OF MANUAL CONCRETE MULTI-PILE GROUND FOR HIGH CONCRETE BUILDING IN KARST REGION
Xie Cheng. ANALYSES OF MANUAL CONCRETE MULTI-PILE GROUND FOR HIGH CONCRETE BUILDING IN KARST REGION[J]. Journal of Gansu Sciences, 2003, 15(Z1): 183-185
Authors:Xie Cheng
Abstract:
Using some field cases of one high concrete building in Karst region, the author made analysis on the following aspects, such as geological analysis, working methods,processing of basic ground,choosing of basic schemes,etc. It was found that good efficiency was got in dealing with the problem of basic ground by using manual concrete multi|pile. This method could be referentially used in stiffening basic ground in Karst region covered by soil.
Keywords:choosing of basic schemes  manual concrete multi-pile ground  stiffening basic ground  
本文献已被 CNKI 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号