首页 | 本学科首页   官方微博 | 高级检索  
     检索      


Key technology for construction of connection between steel pylon and concrete pile cap of middle pylon of Taizhou Bridge
Authors:Sun Yuxiang  Zhang Hong  Xiao Wenfu  Huang Tao  You Xinpeng
Abstract:Taizhou Bridge is a suspension bridge with three pylons and two 1 080 m main spans. The middle pylon is a steel frame with longitudinal herringbone shape and lateral gate shape. The connection between steel pylon and concrete pile cap is a key part to transfer the huge inner force from the pylon to the foundation. Its construction quality is a critical factor to the overall structural loading of the whole bridge; therefore the contact ratio between the bearing steel plate of pylon and concrete pile cap is required to be over 75 %. The inclined joint surface in two directions, longitudinally at 39/1 920 and laterally at 1/4, posted a challenge to the construction work. A procedure test was carried out to find an optimal construction method by comparison, and finally the post injection method was selected as it can meet the requirement of concrete strength and contact ratio at the connection. The successful application of the post injection method in Taizhou Bridge can provide an example and reference for similar projects in the future.
Keywords:middle pylon  connection  steel pylon  concrete pile cap  contact ratio  post injection method
本文献已被 CNKI 等数据库收录!
点击此处可从《工程科学》浏览原始摘要信息
点击此处可从《工程科学》下载免费的PDF全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号