Insurance ratemaking method for risk of construction diversion project
Authors:Chen Zhiding and Hu Zhigen
Institution:1.College of Hydraulic & Environmental Engineering, China Three Gorges University, Yichang, Hubei 443002, China; 2.State Key Laboratory of Water Resources and Hydropower Engineering Science, Wuhan University, Wuhan 430072, China;2.State Key Laboratory of Water Resources and Hydropower Engineering Science, Wuhan University, Wuhan 430072, China
Abstract:Based on analyzing risk factors of diversion project, synthetic risk rate and engineering insurance period, the frequency and distribution law of loss are researched on the grounds that foundation pit is submerged after diversion project ceases to be effective. And then, the standpoint that these total loss is subject to non-homogeneous compound Poisson processes is put forward. Furthermore, the collective risk model of the total loss about engineering insurance is established on the basis of construction diversion project risk. Ultimately, insurance ratemaking method for construction engineering risk and its mathematical expression are presented, which provides theoretical method for the insurance ratemaking of hydropower engineering to some extent.
Keywords:diversion risk  engineering insurance  insurance premium  non-homogeneous compound Poisson processes
本文献已被 CNKI 等数据库收录!
点击此处可从《工程科学》浏览原始摘要信息
点击此处可从《工程科学》下载免费的PDF全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号