古田溪三级电站坝基及扬压力异常情况分析
引用本文:杨光中,杨保全.古田溪三级电站坝基及扬压力异常情况分析[J].河海大学学报(自然科学版),1997,25(3):1-6.
作者姓名:杨光中  杨保全
作者单位:[1]河海新技术开发公司 [2]河海大学土木工程学院
摘    要:对我国50年代末期有代表性的边勘测,边设计,边施工的“三边”工程之一-古田溪三级电站运行30多年来,其大坝基础状况及部分扬压力孔发生异常等情况作了分析研究,提出一些建议,对处理类似的三边工程具有实际意义。

关 键 词:扬压力  帷幕灌浆  渗漏  水电站  坝基  混凝土坝
修稿时间:2005/1/28 0:00:00

Analysis of the Abnomal Situation of Dam Foundation and Uplift Pressure at the Third Step Gutianxi Hydroelectric Plant
Yang,Guangzhong.Analysis of the Abnomal Situation of Dam Foundation and Uplift Pressure at the Third Step Gutianxi Hydroelectric Plant[J].Journal of Hohai University (Natural Sciences ),1997,25(3):1-6.
Authors:Yang  Guangzhong
Abstract:This paper analyses and studies the situation of the dam foundation and the abnomal uplift pressure drill holes of Gutianxi Third Step Electricpower Station, which is one of the typical projects surveyed, designed and constructed at the same time in late 1950s. this paper puts forward some suggestions which can be used for similar projects.
Keywords:uplift  pressure  grout  curtain  grouting  infiltration  